What's changing near S43 2PG
Within 2 km, around New Whittington, Hollingwood & Barrow Hill in Chesterfield. Building, planning, schools, transport, prices and crime.
17new homes completed within 2 km, last 2 years
9homes given permission on brownfield sites since 2021
+4.8%like-for-like prices in New Whittington, Hollingwood & Barrow Hill, 2024 → 2025 (council +3.5%)
-7%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- Planning permission
Permission for 9 homesSt Patricks Church Hall, High Street, New Whittington, S43 2AN (full planning permission) Jun 2021
1.9 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 7 postcodes nearby had new homes completed in the last two years.
2homes extended 2021–2025, typically adding 28 m²
2since energy certificates began (2008)
0in S43 2PG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
240hours of spills in 2025 between them (typical neighbourhood: about 36)
65spill events counted
- Yorkshire Water
Troughbrook Road No 2 Csointo Trough Brook35 spills, 141 hours in 2025
850 m away - Yorkshire Water
Works Road Csointo River Rother11 spills, 36 hours in 2025
250 m away - Yorkshire Water
Mill Green Csointo River Rother14 spills, 35 hours in 2025
1.4 km away - Yorkshire Water
Station Rd Staveley Csointo Trough Brook Trib Of R.Rother5 spills, 28 hours in 2025
350 m away - Yorkshire Water
Chesterfield Road Csointo River Rother0 spills, 0 hours in 2025
1.3 km away - Yorkshire Water
Albert Road Csointo River Rother0 spills, 0 hours in 2025
1.6 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
30 planned, approved or being built and 16 running (104 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Inkersall Primary Academy, Inkersall Green Road - Solar PanelsApproved, not yet built · 160 kW
Mar 2026
2.2 km away - Solar farm
Old Whittington Wastewater Treatment Works, Station Lane - Solar ArrayApproved, not yet built · 250 kW
Jul 2023
3.2 km away - Rooftop solar
Sainsburys, Rother Way - Solar PanelsApproved, not yet built · 350 kW
Feb 2024
3.6 km away - Battery storage
Seymour, Link Road - Micro Energy Storage ProjectApproved, not yet built · 200 kW
Nov 2025
3.6 km away - Rooftop solar
Holdsworth Cold Store, Duckmanton - Solar panelsApproved, not yet built · 230 kW
Sept 2023
3.9 km away - Rooftop solar
Arnold Clark Motorstore, Meltham Lane - Solar PanelsApproved, not yet built · 190 kW
Apr 2025
4.1 km away - Rooftop solar
Heraeus Electro-Nite Uk, Sheffield Road - Solar PanelsApproved, not yet built · 540 kW
Mar 2023
4.3 km away - Rooftop solar
Grangers International Enterprise Way - Solar PanelsApproved, not yet built · 250 kW
Aug 2025
4.4 km away - Battery storage
Lodge Farm, Calow - Battery Energy Storage SystemApproved, not yet built · 25 MW
Jul 2025
4.4 km away - Rooftop solar
Stagecoach Stonegravels Depot, Sheffield Road - Solar PanelsPlanning application in · 230 kW
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council. application due June 2026
13.4 km away - Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire. application due June 2027
27.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Staveley Power (landfill gas, 1000 m); The Breck (solar farm, 1.3 km); Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage (solar farm, 3.1 km); Inkersall Road, Staveley - Solar Photovoltaic Farm And Battery Storage (battery storage, 3.1 km); Arkwright Solar Farm (solar farm, 3.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.