Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
6storm overflows within 2 km
240hours of spills in 2025 between them (typical neighbourhood: about 36)
65spill events counted
Yorkshire Water
Troughbrook Road No 2 Csointo Trough Brook35 spills, 141 hours in 2025
250 m away
Yorkshire Water
Works Road Csointo River Rother11 spills, 36 hours in 2025
650 m away
Yorkshire Water
Mill Green Csointo River Rother14 spills, 35 hours in 2025
1.4 km away
Yorkshire Water
Station Rd Staveley Csointo Trough Brook Trib Of R.Rother5 spills, 28 hours in 2025
800 m away
Yorkshire Water
Chesterfield Road Csointo River Rother0 spills, 0 hours in 2025
1.3 km away
Yorkshire Water
Albert Road Csointo River Rother0 spills, 0 hours in 2025
30 planned, approved or being built and 16 running (104 MW between them). Those within 5 km are on the map above.
Rooftop solar
Inkersall Primary Academy, Inkersall Green Road - Solar PanelsApproved, not yet built · 160 kW
Mar 2026 1.5 km away
Solar farm
Old Whittington Wastewater Treatment Works, Station Lane - Solar ArrayApproved, not yet built · 250 kW
Jul 2023 2.7 km away
Rooftop solar
Sainsburys, Rother Way - Solar PanelsApproved, not yet built · 350 kW
Feb 2024 2.9 km away
Rooftop solar
Arnold Clark Motorstore, Meltham Lane - Solar PanelsApproved, not yet built · 190 kW
Apr 2025 3.4 km away
Rooftop solar
Holdsworth Cold Store, Duckmanton - Solar panelsApproved, not yet built · 230 kW
Sept 2023 3.5 km away
Battery storage
Lodge Farm, Calow - Battery Energy Storage SystemApproved, not yet built · 25 MW
Jul 2025 3.6 km away
Battery storage
Seymour, Link Road - Micro Energy Storage ProjectApproved, not yet built · 200 kW
Nov 2025 3.6 km away
Rooftop solar
Stagecoach Stonegravels Depot, Sheffield Road - Solar PanelsPlanning application in · 230 kW
Sept 2024 3.7 km away
Solar farm
Stud Farm, Elliotts Butchers Farm Shop - Solar ArrayApproved, not yet built · 350 kW
Apr 2024 3.9 km away
Rooftop solar
Grangers International Enterprise Way - Solar PanelsApproved, not yet built · 250 kW
Road and street works within 1 km
1 permitted works running now or planned, 1 of them major.
Major
Works Road, HollingwoodWorks for Rail Purposes · NETWORK RAIL · Road closure
Oct 2026 to Oct 2026 750 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
application due June 2026 14.3 km away
Pre-application
Chesterfield to WillingtonElectric Lines · Land between the Chesterfield Substation, south-east of Chesterfield and Willington Substation, east of Willington, Derbyshire.
application due June 2027 26.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in New Whittington, Hollingwood & Barrow Hill: +32% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -1.6% in two years.