Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
646hours of spills in 2025 between them (typical neighbourhood: about 36)
The Baulk, RotherhamUtility asset works · CADENT GAS LIMITED · Multi-way signals
Sept 2026 to Nov 2026 600 m away
Major
Broadoaks Close, RotherhamDisconnection or alteration of supply · NORTHERN POWERGRID (YORKSHIRE) PLC · Road closure
Nov 2026 to Nov 2026 800 m away
Standard
Quarry Lane, RotherhamNew service connection · NORTHERN POWERGRID (YORKSHIRE) PLC · No carriageway incursion
Nov 2026 to Nov 2026 550 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
application due June 2026 4.7 km away
Acceptance
North Humber to High MarnhamElectric Lines · The Project would establish a new 400 kilovolt (kV) transmission connection approximately 90 kilometres(km) in length between a new substation to be built in the vicinity of Birkhill Wood, located to the north of Hull near Creyke Beck in the East Riding of Yorkshire, and a new substation at High Marnham in Nottinghamshire.
Moat Lane, Wickersley - Battery Storage FacilityApproved, not yet built · 100 MW
Nov 2025 5.9 km away
Solar farm
Thurcroft Interchange Energy Park - Solar FarmPlanning application in · 50 MW
Jun 2025 6.0 km away
Running nearest: Loscar Farm (wind farm, 5.3 km); Nether Moor Field (battery storage, 5.4 km); Penny Hill Lane (wind farm, 5.6 km); Holbrook Community Renewable Energy Centre (biomass, 8.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.