Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
1,783hours of spills in 2025 between them (typical neighbourhood: about 36)
160spill events counted
Yorkshire Water
Staveley Wwtwinto River Doe Lea90 spills, 1,090 hours in 2025
1.2 km away
Yorkshire Water
Renishaw Stwinto Smithy Brook60 spills, 679 hours in 2025
700 m away
Yorkshire Water
Westthorpe No 2 Csointo Park Brook10 spills, 13 hours in 2025
25 planned, approved or being built and 16 running (113 MW between them). Those within 5 km are on the map above.
Battery storage
Westthorpe Fields Road, Killamarsh - Battery StorageApproved, not yet built · 200 kW
Jun 2023 2.1 km away
Rooftop solar
Lindrick Way, Barlborough - Solar PanelsApproved, not yet built · 1 MW
Feb 2024 3.1 km away
Battery storage
Seymour, Link Road - Micro Energy Storage ProjectApproved, not yet built · 200 kW
Nov 2025 3.6 km away
Battery storage
Creswell Road, Clowne - Battery StorageApproved, not yet built · 200 kW
Mar 2025 4.6 km away
Rooftop solar
Holdsworth Cold Store, Duckmanton - Solar panelsApproved, not yet built · 230 kW
Sept 2023 5.2 km away
Rooftop solar
Inkersall Primary Academy, Inkersall Green Road - Solar PanelsApproved, not yet built · 160 kW
Mar 2026 5.3 km away
Rooftop solar
Grangers International Enterprise Way - Solar PanelsApproved, not yet built · 250 kW
Aug 2025 5.6 km away
Battery storage
Commerce Park, Markham Lane - Micro Energy StorageApproved, not yet built · 200 kW
Sept 2025 5.6 km away
Battery storage
Hard Lane, Kiveton Park - Battery Energy Storage SystemPlanning application in
Feb 2025 6.4 km away
Solar farm
Old Whittington Wastewater Treatment Works, Station Lane - Solar ArrayApproved, not yet built · 250 kW
Jul 20237.2 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
application due June 2026 10.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Eckington East & Renishaw: +27% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -2.0% in two years.