Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
21storm overflows within 2 km
713hours of spills in 2025 between them (typical neighbourhood: about 36)
350spill events counted
Yorkshire Water
Glenholme Road Csointo Trib Of Shirtcliff Brook41 spills, 185 hours in 2025
750 m away
Yorkshire Water
Bramley Park Close Csointo Shirtcliff Brook37 spills, 106 hours in 2025
750 m away
Yorkshire Water
Prince Of Wales Public Sewerinto Car Brook (Via Public Sewer)32 spills, 77 hours in 2025
1.9 km away
Yorkshire Water
Prince Of Wales Public Sewerinto Car Brook (Via Public Sewer)36 spills, 74 hours in 2025
1.9 km away
Yorkshire Water
Alport Road Csointo Tributary Of Shire Brook35 spills, 63 hours in 2025
Danewood Grove, SheffieldUtility asset works · NORTHERN POWERGRID (YORKSHIRE) PLC · Two-way signals
Nov 2026 to Nov 2026 850 m away
Major
Danebrook Court, SheffieldUtility repair and maintenance works · NORTHERN POWERGRID (YORKSHIRE) PLC · Road closure
Dec 2026 to Dec 2026850 m away
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
application due June 2026 8.0 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Richmond & Stradbroke: +43% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): +0.6% in two years.