Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
18storm overflows within 2 km
648hours of spills in 2025 between them (typical neighbourhood: about 36)
290spill events counted
Yorkshire Water
Glenholme Road Csointo Trib Of Shirtcliff Brook41 spills, 185 hours in 2025
850 m away
Yorkshire Water
Bramley Park Close Csointo Shirtcliff Brook37 spills, 106 hours in 2025
1.2 km away
Yorkshire Water
Rainbow Avenue Spsinto Tributary Of Shire Brook8 spills, 79 hours in 2025
1.7 km away
Yorkshire Water
Alport Road Csointo Tributary Of Shire Brook35 spills, 63 hours in 2025
Tithe Barn Lane, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · Road closure
Oct 2026 to Nov 2026 800 m away
Major
Tithe Barn Lane, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · Road closure
Nov 2026 to Dec 2026 800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
application due June 2026 6.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Woodhouse West: +40% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.5% in two years.
New South Farm, Piper Lane - Solar FarmPlanning application in · 12 MW
Dec 2024 5.5 km away
Rooftop solar
The Food Warehouse, Meadowhall Retail Park - Solar PanelsApproved, not yet built · 160 kW
Feb 2026 5.6 km away
Running nearest: Advanced Manufacturing Research Centre (wind farm, 3.3 km); Holbrook Community Renewable Energy Centre (biomass, 4.4 km); Sheffield ERF (energy from waste, 5.5 km); Penny Hill Lane (wind farm, 6.2 km); Blackburn Meadows Biomass Plant (biomass, 7.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.