Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
4storm overflows within 2 km
90hours of spills in 2025 between them (typical neighbourhood: about 36)
33spill events counted
Yorkshire Water
Bridge Inn Ford Csointo The Moss27 spills, 87 hours in 2025
1.2 km away
Yorkshire Water
Ridgeway Well Csointo Tributary Of The Moss5 spills, 3 hours in 2025
150 m away
Yorkshire Water
Primary School Csointo Trib Of The Moss1 spills, 1 hours in 2025
200 m away
Yorkshire Water
Swan Inn Csointo Trib Of The Moss0 spills, 0 hours in 2025
40 planned, approved or being built and 11 running (100 MW between them). Those within 5 km are on the map above.
Rooftop solar
Charnock Hall Primary School, Carter Hall Road - Solar PanelsPlanning application in · 170 kW
Jun 2026 2.0 km away
Battery storage
Orgreave Place - Flexible Energy FacilityApproved, not yet built
Mar 2026 5.1 km away
Battery storage
Westthorpe Fields Road, Killamarsh - Battery StorageApproved, not yet built · 200 kW
Jun 2023 5.4 km away
Rooftop solar
William Lee Limited, Callywhite Lane - Solar PanelsApproved, not yet built
May 2024 5.5 km away
Rooftop solar
William Lee, Callywhite Lane - Solar PanelsApproved, not yet built · 290 kW
Jun 2024 5.5 km away
Battery storage
Chesterfield Road, Swallownest - Battery Energy StoragePlanning application in
Sept 2023 5.7 km away
Rooftop solar
Sainsburys, Wreakes Lane - Solar PanelsApproved, not yet built · 170 kW
Jan 2026 6.0 km away
Rooftop solar
The Big Yellow Self Storage, Queens Road - Solar PanelsApproved, not yet built · 150 kW
Nov 2022 6.2 km away
Rooftop solar
Advanced Blade Building, Brunel Way - Solar PhotovoltaicsApproved, not yet built · 810 kW
Nov 2024 6.4 km away
Rooftop solar
Heraeus Electro-Nite Uk, Sheffield Road - Solar PanelsApproved, not yet built · 540 kW
Mar 20237.1 km away
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
application due June 2026 9.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Eckington West & Coal Aston: +27% over five years (2020 → 2025).
Council tax list: 10 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.2% in two years.
Darnall Road - Battery Energy StorageApproved, not yet built
Aug 2022 7.4 km away
Solar farm
New South Farm, Piper Lane - Solar FarmPlanning application in · 31 MW
Dec 2024 7.6 km away
Running nearest: Holbrook Community Renewable Energy Centre (biomass, 4.3 km); The Breck (solar farm, 5.9 km); Advanced Manufacturing Research Centre (wind farm, 6.5 km); Staveley Power (landfill gas, 6.7 km); Sheffield ERF (energy from waste, 7.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.