Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
108hours of spills in 2025 between them (typical neighbourhood: about 36)
40 planned, approved or being built and 10 running (120 MW between them). Those within 5 km are on the map above.
Rooftop solar
Charnock Hall Primary School, Carter Hall Road - Solar PanelsPlanning application in · 170 kW
Jun 2026 800 m away
Rooftop solar
The Big Yellow Self Storage, Queens Road - Solar PanelsApproved, not yet built · 150 kW
Nov 2022 3.7 km away
Rooftop solar
William Lee Limited, Callywhite Lane - Solar PanelsApproved, not yet built
May 2024 5.0 km away
Rooftop solar
William Lee, Callywhite Lane - Solar PanelsApproved, not yet built · 290 kW
Jun 2024 5.0 km away
Rooftop solar
Sainsburys, Wreakes Lane - Solar PanelsApproved, not yet built · 170 kW
Jan 2026 5.1 km away
Battery storage
Orgreave Place - Flexible Energy FacilityApproved, not yet built
Mar 2026 5.3 km away
Rooftop solar
Royal Hallamshire Hospital, Glossop Road - Solar PanelsApproved, not yet built · 190 kW
Feb 2024 5.8 km away
Rooftop solar
Special Melted Products, President Way Works - Solar PanelsApproved, not yet built · 990 kW
Mar 2023 5.9 km away
Battery storage
Darnall Road - Battery Energy StorageApproved, not yet built
Aug 2022 6.0 km away
Rooftop solar
Special Melted Products, Atlas Works - Solar PV PanelsApproved, not yet built · 300 kW
Apr 2023 6.1 km away
Road and street works within 1 km
2 permitted works running now or planned, 2 of them major.
Major, planned
Raeburn Road, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · Road closure
Oct 2026 to Nov 2026 600 m away
Major
Raeburn Road, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · Road closure
Nov 2026 to Dec 2026 600 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
application due June 2026 10.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Charnock & Basegreen: +36% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.7% in two years.