What's changing near S12 2NE
Within 2 km, around Gleadless in Sheffield. Building, planning, schools, transport, prices and crime.
3new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-3.5%like-for-like prices in Gleadless, 2024 → 2025 (council +2.9%)
-6%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New schoolApr 2023
1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
9homes extended 2021–2025, typically adding 19 m²
16since energy certificates began (2008)
1in S12 2NE itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
3storm overflows within 2 km
140hours of spills in 2025 between them (typical neighbourhood: about 36)
65spill events counted
- Yorkshire Water
Birley Vale Combined Sewer Overflowinto Shire Brook20 spills, 55 hours in 2025
1.5 km away - Yorkshire Water
Seagrave Crescent 2 Csointo Shire Brook27 spills, 53 hours in 2025
400 m away - Yorkshire Water
Gleadless Road Csointo Tributary Of Meers Brook18 spills, 32 hours in 2025
1.9 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
40 planned, approved or being built and 11 running (140 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Charnock Hall Primary School, Carter Hall Road - Solar PanelsPlanning application in · 170 kW
Jun 2026
850 m away - Rooftop solar
The Big Yellow Self Storage, Queens Road - Solar PanelsApproved, not yet built · 150 kW
Nov 2022
3.4 km away - Battery storage
Orgreave Place - Flexible Energy FacilityApproved, not yet built
Mar 2026
4.8 km away - Rooftop solar
Special Melted Products, President Way Works - Solar PanelsApproved, not yet built · 990 kW
Mar 2023
5.3 km away - Battery storage
Darnall Road - Battery Energy StorageApproved, not yet built
Aug 2022
5.3 km away - Rooftop solar
Special Melted Products, Atlas Works - Solar PV PanelsApproved, not yet built · 300 kW
Apr 2023
5.5 km away - Rooftop solar
Advanced Blade Building, Brunel Way - Solar PhotovoltaicsApproved, not yet built · 810 kW
Nov 2024
5.5 km away - Rooftop solar
Royal Hallamshire Hospital, Glossop Road - Solar PanelsApproved, not yet built · 190 kW
Feb 2024
5.5 km away - Rooftop solar
William Lee Limited, Callywhite Lane - Solar PanelsApproved, not yet built
May 2024
5.7 km away - Rooftop solar
William Lee, Callywhite Lane - Solar PanelsApproved, not yet built · 290 kW
Jun 20245.7 km away
Road and street works within 1 km
16 permitted works running now or planned, 2 of them major.
- Major, planned
Raeburn Road, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · Road closure
Oct 2026 to Nov 2026
700 m away - Major
Raeburn Road, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · Road closure
Nov 2026 to Dec 2026
700 m away - Minor
Grassthorpe Road, SheffieldUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026
450 m away - Minor
Grassthorpe Road, SheffieldUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026
500 m away - Minor
Grassthorpe Road, SheffieldUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026
500 m away - Minor
Grassthorpe Road, SheffieldUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026
500 m away - Minor
Grassthorpe Road, SheffieldUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026
500 m away - Minor
Welwyn Road, SheffieldUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026
600 m away - Minor
Welwyn Road, SheffieldUtility repair and maintenance works · YORKSHIRE WATER · No carriageway incursion
Oct 2026 to Oct 2026
700 m away - Minor
Major infrastructure projects within 30 km
- Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council. application due June 2026
10.3 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Sheffield ERF (energy from waste, 4.6 km); Advanced Manufacturing Research Centre (wind farm, 5.6 km); Holbrook Community Renewable Energy Centre (biomass, 6.7 km); Parkwood Landfill Scheme (landfill gas, 7.1 km); Blackburn Meadows Biomass Plant (biomass, 8.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.