Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
22storm overflows within 2 km
961hours of spills in 2025 between them (typical neighbourhood: about 36)
406spill events counted
Yorkshire Water
Little London Road Csointo Meers Brook45 spills, 122 hours in 2025
1.1 km away
Yorkshire Water
Leyburn Road Sheffield No2 Csointo River Sheaf30 spills, 113 hours in 2025
1.2 km away
Yorkshire Water
Stalker Walk No 2csointo Porter Brook42 spills, 99 hours in 2025
400 m away
Yorkshire Water
Broadfield Road Csointo River Sheaf24 spills, 92 hours in 2025
1.1 km away
Yorkshire Water
Sheaf Bank Combined Sewer Overflowinto River Sheaf33 spills, 74 hours in 2025
950 m away
Yorkshire Water
Yws Unknown Sites Defaultinto River Sheaf24 spills, 68 hours in 2025
1.4 km away
Yorkshire Water
Abbeydale Road 62 No2 Csointo River Sheaf7 spills, 65 hours in 2025
37 planned, approved or being built and 8 running (114 MW between them). Those within 5 km are on the map above.
Rooftop solar
The Big Yellow Self Storage, Queens Road - Solar PanelsApproved, not yet built · 150 kW
Nov 2022 1000 m away
Rooftop solar
Royal Hallamshire Hospital, Glossop Road - Solar PanelsApproved, not yet built · 190 kW
Feb 2024 1.3 km away
Rooftop solar
Special Melted Products, President Way Works - Solar PanelsApproved, not yet built · 990 kW
Mar 2023 3.5 km away
Rooftop solar
Special Melted Products, Atlas Works - Solar PV PanelsApproved, not yet built · 300 kW
Apr 2023 3.9 km away
Rooftop solar
The Big Yellow Self Storage, Penistone Road - Solar PanelsApproved, not yet built · 160 kW
Nov 2022 4.4 km away
Battery storage
Petre & Carlisle Street East & Petre Street - Battery StorageApproved, not yet built
May 2023 4.6 km away
Battery storage
Hunsley Street - Battery Energy StorageApproved, not yet built
Feb 2023 4.8 km away
Battery storage
Darnall Road - Battery Energy StorageApproved, not yet built
Aug 2022 4.9 km away
Rooftop solar
Sytner BMW Sheffield, Brightside Way - Solar PanelsApproved, not yet built · 1 MW
Dec 2025 5.0 km away
Rooftop solar
Charnock Hall Primary School, Carter Hall Road - Solar PanelsPlanning application in · 170 kW
Jun 20265.1 km away
Road and street works within 1 km
22 permitted works running now or planned, 21 of them major.
Major, planned
Wostenholm Road, SheffieldHighway improvement works · SHEFFIELD CITY COUNCIL · Road closure
Nov 2026 to Nov 2026 350 m away
Major
Wostenholm Road, SheffieldHighway improvement works · SHEFFIELD CITY COUNCIL · Road closure
Nov 2026 to Nov 2026 350 m away
Major
Pear Street, SheffieldUtility repair and maintenance works · YORKSHIRE WATER · Road closure
Dec 2026 to Dec 2026 350 m away
Major, planned
Hill Street, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · Road closure
Oct 2026 to Nov 2026 400 m away
Major, planned
London Road, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · Lane closure
Oct 2026 to Dec 2026 450 m away
Major, planned
London Road, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · Road closure
Nov 2026 to Dec 2026 450 m away
Major, planned
Sawdon Road, SheffieldHighway improvement works · SHEFFIELD CITY COUNCIL · Road closure
Nov 2026 to Nov 2026 450 m away
Major
Sawdon Road, SheffieldHighway improvement works · SHEFFIELD CITY COUNCIL · Road closure
Nov 2026 to Nov 2026 450 m away
Major, planned
St Barnabas Lane, SheffieldUtility asset works · SHEFFIELD CITY COUNCIL · Road closure
Oct 2026 to Nov 2026 500 m away
Major
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
application due June 2026 13.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Sharrow: +31% over five years (2020 → 2025).
Council tax list: 200 homes added in the neighbourhood since April 2024.
Population (GP registrations): -3.6% in two years.