What's changing near S10 4JG
Within 2 km, around Fulwood & Lodge Moor in Sheffield. Building, planning, schools, transport, prices and crime.
8new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-0.4%like-for-like prices in Fulwood & Lodge Moor, 2024 → 2025 (council +2.9%)
-11%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
10homes extended 2021–2025, typically adding 32 m²
22since energy certificates began (2008)
2in S10 4JG itself
- Extendedcertificate 2022
- Extendedcertificate 2017
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
7storm overflows within 2 km
143hours of spills in 2025 between them (typical neighbourhood: about 36)
48spill events counted
- Yorkshire Water
Slayleigh Lane Csointo Porter Brook32 spills, 69 hours in 2025
1.7 km away - Yorkshire Water
Rochester Road Sewage Pumping Stninto Unnamed Trib Of Black Brook8 spills, 45 hours in 2025
250 m away - Yorkshire Water
Yorkshire Water Services Ltd, Deteninto Porter Brook4 spills, 28 hours in 2025
1.5 km away - Yorkshire Water
Stumperlowe Road Csointo Porter Brook4 spills, 1 hours in 2025
1.9 km away - Yorkshire Water
Snaithing Park Road Csointo Tributary Of Porter Brook0 spills, 0 hours in 2025
1.6 km away - Yorkshire Water
Belgrave Road West Csointo Tributary Of Porter Brook0 spills, 0 hours in 2025
1.7 km away - Yorkshire Water
Snaithing Lane Csointo Tributary Of Porter Brook0 spills, 0 hours in 2025
1.8 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
20 planned, approved or being built and 2 running (21 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Royal Hallamshire Hospital, Glossop Road - Solar PanelsApproved, not yet built · 190 kW
Feb 2024
4.3 km away - Rooftop solar
The Big Yellow Self Storage, Penistone Road - Solar PanelsApproved, not yet built · 160 kW
Nov 2022
5.6 km away - Rooftop solar
The Big Yellow Self Storage, Queens Road - Solar PanelsApproved, not yet built · 150 kW
Nov 2022
6.0 km away - Rooftop solar
Sainsburys Supermarkets - Solar PV ArrayPlanning application in · 350 kW
Aug 2024
6.1 km away - Rooftop solar
Fletchers Bakeries, Clay Wheels Lane - Solar ArrayApproved, not yet built · 650 kW
Dec 2022
6.2 km away - Rooftop solar
Fletchers Bakeries Limited, Clay Wheels Lane - Solar PanelsPlanning application in · 600 kW
Aug 2023
6.2 km away - Rooftop solar
Special Melted Products, President Way Works - Solar PanelsApproved, not yet built · 990 kW
Mar 2023
7.5 km away - Rooftop solar
Special Melted Products, Atlas Works - Solar PV PanelsApproved, not yet built · 300 kW
Apr 2023
7.9 km away - Rooftop solar
Woolley Wood School, Chaucer Road - Solar PanelsApproved, not yet built · 190 kW
Mar 2026
8.1 km away - Battery storage
Petre & Carlisle Street East & Petre Street - Battery StorageApproved, not yet built
Road and street works within 1 km
1 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council. application due June 2026
18.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Parkwood Landfill Scheme (landfill gas, 6.2 km); Sheffield ERF (energy from waste, 7.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.