Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
14storm overflows within 2 km
705hours of spills in 2025 between them (typical neighbourhood: about 36)
318spill events counted
Yorkshire Water
Rivelin Valley 3 Csointo River Rivelin56 spills, 214 hours in 2025
1.5 km away
Yorkshire Water
Watersmeet Road No1 Csointo River Loxley47 spills, 104 hours in 2025
37 planned, approved or being built and 8 running (114 MW between them). Those within 5 km are on the map above.
Rooftop solar
Royal Hallamshire Hospital, Glossop Road - Solar PanelsApproved, not yet built · 190 kW
Feb 2024 1.1 km away
Rooftop solar
The Big Yellow Self Storage, Penistone Road - Solar PanelsApproved, not yet built · 160 kW
Nov 2022 2.6 km away
Rooftop solar
The Big Yellow Self Storage, Queens Road - Solar PanelsApproved, not yet built · 150 kW
Nov 2022 3.2 km away
Rooftop solar
Fletchers Bakeries, Clay Wheels Lane - Solar ArrayApproved, not yet built · 650 kW
Dec 2022 3.7 km away
Rooftop solar
Fletchers Bakeries Limited, Clay Wheels Lane - Solar PanelsPlanning application in · 600 kW
Aug 2023 3.7 km away
Rooftop solar
Sainsburys Supermarkets - Solar PV ArrayPlanning application in · 350 kW
Aug 2024 3.8 km away
Rooftop solar
Special Melted Products, President Way Works - Solar PanelsApproved, not yet built · 990 kW
Mar 2023 3.9 km away
Rooftop solar
Special Melted Products, Atlas Works - Solar PV PanelsApproved, not yet built · 300 kW
Apr 2023 4.3 km away
Battery storage
Petre & Carlisle Street East & Petre Street - Battery StorageApproved, not yet built
May 2023 4.8 km away
Battery storage
Hunsley Street - Battery Energy StorageApproved, not yet built
Feb 20234.9 km away
Road and street works within 1 km
20 permitted works running now or planned, 17 of them major.
Major
Sackville Road, SheffieldUtility asset works · CADENT GAS LIMITED · Road closure
Aug 2026 to Nov 2026 100 m away
Major
Crookes, SheffieldUtility asset works · CADENT GAS LIMITED · Two-way signals
Aug 2026 to Nov 2026 100 m away
Major
Crookes, SheffieldUtility asset works · CADENT GAS LIMITED · Two-way signals
Nov 2026 to Nov 2026 100 m away
Major
Crookes, SheffieldUtility asset works · CADENT GAS LIMITED · Two-way signals
Nov 2026 to Nov 2026 150 m away
Major
Carson Road, SheffieldUtility asset works · CADENT GAS LIMITED · Road closure
Nov 2026 to Nov 2026 150 m away
Major
School Road, SheffieldUtility asset works · CADENT GAS LIMITED · Road closure
Nov 2026 to Dec 2026 150 m away
Major
Crookes, SheffieldUtility asset works · CADENT GAS LIMITED · Two-way signals
Nov 2026 to Nov 2026 200 m away
Major
Coombe Road, SheffieldUtility asset works · CADENT GAS LIMITED · Road closure
Jan 2027 to Jan 2027 250 m away
Major
Crookes, SheffieldUtility asset works · CADENT GAS LIMITED · Two-way signals
Jan 2027 to Jan 2027 250 m away
Major, planned
Nairn Street, SheffieldHighway improvement works · SHEFFIELD CITY COUNCIL · Road closure
Major infrastructure projects within 30 km
Pre-examination
Whitestone Solar FarmGenerating Stations · Approximately 8km east of Rotherham, within the administrative areas of the City of Doncaster Council and Rotherham Metropolitan Borough Council.
application due June 2026 14.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
None on our list yet. We're starting with recently opened and under-construction rail schemes.
The longer view
Like-for-like prices in Springvale & Steel Bank: +31% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -5.5% in two years.