What's changing near RM9 5DD
Within 2 km, around Dagenham North in Barking and Dagenham. Building, planning, schools, transport, prices and crime.
513new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
-0.4%like-for-like prices in Dagenham North, 2024 → 2025 (council +2.4%)
+4%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedSchool closedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
82 new homes completedflats · Sep 2026
Sept 2026
1.9 km away - New schoolJan 2026
1.9 km away - New homes
91 new homes completedflats · Jan 2026
Jan 2026
1.2 km away - New homes
63 new homes completedflats · May 2025 – Dec 2025
Dec 2025
1.2 km away - New homes
10 new homes completedflats · Nov 2025
Nov 2025
1.2 km away - New schoolSept 2025
1.3 km away - School closed
School closed: Alamiyah SchoolOther independent school, other independent school (closure)
Jul 2025
1.5 km away - New homes
49 new homes completed36 flats, 13 houses · Mar 2025
Mar 2025
1.4 km away - New homes
65 new homes completedflats · Dec 2024 – Feb 2025
Feb 2025
1.8 km away - New homes
77 new homes completedflats · Dec 2024 – Feb 2025
Feb 2025
1.8 km away - New homes
36 new homes completedflats · Jan 2025
Jan 2025850 m away
Planning applications within 500 m
25applications in the last 12 months
3approved · 2 refused
20still being decided
7net new homes in approved schemes since 2023
- Application Under Consideration
3, RAYDONS GARDENS, RM9 5JSConstruction of an access ramp to the front elevationBarking & Dagenham 26/01332/HSE · Householder
Sept 2026
350 m away - Application Under Consideration
344, HEATHWAY, RM10 8NJConstruction of a part two storey part single storey side extension including relocation of the entrance to the frontBarking & Dagenham 26/01268/HSE · Householder
Sept 2026
450 m away - Application Under Consideration
31, MONMOUTH ROAD, RM9 5DDConstruction of a single storey rear outbuilding, demolition of existing rear extension and construction of a part two- storey part single storey rear extension including three roof lights and addition of two Juliette balconies to the rear elevation [Retrospective] and removal of two roof lights and ground floor parapet wall, addition of a window to the rear elevation, demolition of second floor rBarking & Dagenham 26/01271/HSE · Householder
Sept 2026
0 m away - Application Under Consideration
108, PARSLOES AVENUE, RM9 5NTConstruction of a single storey rear outbuilding [retrospective]Barking & Dagenham 26/01134/HSE · Householder
Aug 2026
100 m away - Application Under Consideration
10, RAYDONS GARDENS, RM9 5JSApplication for a lawful development certificate (existing) for the use of the dwelling by up to 3 people living together as a single household and receiving care (Use Class C3(b)Barking & Dagenham 26/01137/CLUE · Householder
Aug 2026
400 m away - Application Under Consideration
64, HALBUTT STREET, RM9 5ARApplication for a lawful development certificate (existing) for the use of the dwelling as a supported care facility for young adults, for up to three 16-25 year old care leavers living together (Use Class C3(B))
27homes extended 2021–2025, typically adding 28 m²
48since energy certificates began (2008)
1in RM9 5DD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
70hours of spills in 2025 between them (typical neighbourhood: about 36)
32spill events counted
- Thames Water
Longbridge Roadinto Mayes Brook28 spills, 65 hours in 2025
2.0 km away - Thames Water
Longbridge Roadinto Mayes Brook4 spills, 5 hours in 2025
2.0 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
61 planned, approved or being built and 23 running (163 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Hunters Hall Primary School, Alibon Road - Solar PanelsApproved, not yet built · 250 kW
Jul 2024
1000 m away - Rooftop solar
Goresbrook School, Cook Road - Solar PanelsApproved, not yet built · 370 kW
May 2026
1.7 km away - Rooftop solar
Pooles Lane - Solar PV PanelsApproved, not yet built · 350 kW
Aug 2025
2.0 km away - Rooftop solar
JJ Food Service, Orion Park Messina Way - Solar PanelsApproved, not yet built · 570 kW
Nov 2023
2.0 km away - Rooftop solar
Thames Gateway Park, Choats Road - Solar PanelsApproved, not yet built · 470 kW
Jun 2023
2.5 km away - Energy from waste
Thames Gateway EfWApproved, not yet built · 19 MW
Nov 2014
2.6 km away - Rooftop solar
Barking And Dagenham College, Dagenham Road - Solar PanelsApproved, not yet built · 800 kW
May 2025
2.8 km away - Rooftop solar
Barking & Dagenham College Of Technology, Dagenham Road - SolarApproved, not yet built
Apr 2025
2.8 km away - Rooftop solar
Dagenham Motors, Ripple Road - Solar PanelsApproved, not yet built · 250 kW
Jun 2023
2.9 km away - Rooftop solar
Manor Joinery Estate, Eastern Approach Alfreds Way - Solar PanelsApproved, not yet built · 310 kW
Feb 2023
3.0 km away
Road and street works within 1 km
3 permitted works running now or planned, 3 of them major.
- Major, planned
Alibon Road, DagenhamUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Apr 2027 to May 2027
900 m away - Major
Alibon Road, DagenhamUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Apr 2027 to May 2027
900 m away - Major, planned
Hunters Hall Road, DagenhamUtility asset works · CADENT GAS LIMITED · Some carriageway incursion
Apr 2027 to Jun 2027
950 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
4.6 km away - Decideddecided Nov 2025
4.8 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
10.3 km away - Decideddecided May 2022
10.8 km away - Pre-applicationapplication due March 2028
11.8 km away - Decideddecided Apr 2014
14.5 km away - Decided
Transport schemes within 20 km
Running nearest: Ford Motor Company Ltd (Extension) (wind farm, 2.0 km); Dagenham Docks Biogas (Waste AD) (anaerobic digestion, 2.5 km); East Dagenham Docks AD (AD) (anaerobic digestion, 2.8 km); Ford Wind Park - Dagenham (wind farm, 3.1 km); Crossness Sewage Works PV (rooftop solar, 4.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.