Within 2 km, around Chadwell Heath North West in Redbridge. Building, planning, schools, transport, prices and crime.
146new homes completed within 2 km, last 2 years
104homes given permission on brownfield sites since 2021
+6.7%like-for-like prices in Chadwell Heath North West, 2024 → 2025 (council +2.9%)
+6%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New homes
5 new homes completedflats · May 2026
Jun 2026 1.8 km away
New homes
11 new homes completedflats · May 2026
May 2026 1.9 km away
New homes
14 new homes completedflats · Dec 2025
Dec 2025 1.5 km away
New homes
6 new homes completedflats · Dec 2025
Dec 2025 1.4 km away
New homes
13 new homes completedflats · Jul 2025
Jul 2025 1.8 km away
New homes
10 new homes completedflats · Jul 2025
Jul 2025 1.7 km away
New homes
9 new homes completedflats · Jul 2025
Jul 2025 1.8 km away
New homes
8 new homes completedflats · Jul 2025
Jul 2025 1.8 km away
New homes
6 new homes completedflats · Feb 2025
Feb 2025 2.0 km away
New homes
45 new homes completedflats · Dec 2024
Dec 2024 1.8 km away
Planning permission
Permission for 104 homesFormer White Horse Pub, Chadwell Heath (full planning permission)
Jul 2024 1.6 km away
New school
New school: Hatchside SchoolFree schools special, free schools special
Apr 2021 1.4 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 24 postcodes nearby had new homes completed in the last two years.
Planning applications within 500 m
42applications in the last 12 months
26approved · 4 refused
4still being decided
4net new homes in approved schemes since 2023
Application Under Consideration
298, Chadwell Heath Lane, RM6 4YJChange of use from a single dwelling house (C3) to supported living accommodation (C3(b)) for up to six adults with support staff. (Summary).Redbridge 2513/26 · All Other
Sept 2026 200 m away
Approved
18 47, ST JAMES GARDENSInstallation of two electric vehicle charging units within car park. (summary)Redbridge 2192/26 · All Other
Sept 2026 350 m away
Application Under Consideration
56, Billet Road, RM6 5SUPart first floor front / side extension. One front rooflight. (Summary).Redbridge 2297/26 · All Other
Sept 2026 450 m away
Approved
Land Rear Of 7 St James Gardens, Hainault RoadTPO 45/10 - G1 (approx 21 sycamore) - Fell to ground level. (summary)Redbridge 2227/26 · All Other
Sept 2026 250 m away
Approved
73, Heathfield Park Drive, RM6 4FJSingle storey rear linked outbuilding extension to rear garage. Conversion of garage. Alterations to fenestrations. (Retrospective). (Summary).Redbridge 2195/26 · All Other
Aug 2026 400 m away
Approved
121, Brian Road, RM6 5BTPart first floor rear extension. Alterations to fenestrations. (Summary).Redbridge 2169/26 · All Other
Aug 2026 400 m away
Approved
110, Brian Road, RM6 5BTRemove chimney. Loft conversion with rear dormer incorporating a Juliet balcony. Hip to gable roof alterations. Three front rooflights. (Summary).Redbridge 2076/26 · All Other
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
15, Stroud's Close, RM6 4XDChange of use from dwellinghouse (Class 3(a) to adult supported living (Class C3(b) (summary)Redbridge 2081/26 · All Other · 1 homes proposed
Aug 2026 300 m away
Approved
LAND ON THE WEST SIDE OF 15, ST JAMES GARDENSTPO 45/10 - T1 (Lime) - Reduce by 1.5m. (Summary)Redbridge 1710/26 · All Other
Jul 2026 350 m away
Approved
7, St James Gardens, RM6 5RYTPO 45/10 T1 (Sycamore)-Cut down to ground level T2 (Sycamore)-Cut back from road by approx 3m and lift to 3m AGL over footpath. T3 (Sycamore)- Cut back from road by approx 3m and lift to 3m AGL over footpath. T4 (Ash)- Cut back from road by approx 3m and lift to 3m AGL over footpath. T5 (Horse Chestnut)-Cut back from road by approx 3m and lift to 3m AGL over footpath (summary)Redbridge 1898/26 · All Other
Jul 2026 300 m away
Not Required
24, Norwich Crescent, RM6 4UWSingle storey rear extension with a depth of 6.00 metres, highest point of 3.00 metres and height at the eaves of 3.00 metres.Redbridge 1837/26 · All Other
Jul 2026 500 m away
Approved
80, Freshwell Avenue, RM6 5DRRear outbuilding (summary)Redbridge 1771/26 · All Other
Jul 2026 50 m away
Approved
20, Norwich Crescent, RM6 4UWTPO 01/03 - T1 (Lime) - Reduce the crown by 3m-4m and remove major deadwood. (Summary)Redbridge 1816/26 · All Other
Jul 2026 500 m away
Approved
12, Tendring Way, RM6 5DXRemove chimney. Loft conversion with a rear dormer. New window to gable end. Two front rooflights. Detached rear outbuilding. (Summary)Redbridge 1677/26 · All Other
Jun 2026 350 m away
Approved
39, Freshwell Avenue, RM6 5DSSingle storey rear extension with a depth of 6.00 metres, highest point of 3.20 metres and height at the eaves of 3.00 metres.Redbridge 1658/26 · All Other
Jun 2026 200 m away
Refused
1, DEVELOPMENT AT 1, ROCHFORD AVENUEDischarge of conditions for approved permission 1323/25: BNG (Condition 4); Walls and fences (Condition 5); and Cycle parking (Condition 7). (Summary).Redbridge 1323/25/01 · All Other
Jun 2026 150 m away
Not Required
100, Heathfield Park Drive, RM6 4FJSingle storey rear extension with a depth of 3.00 metres, highest point of 3.00 metres and height at the eaves of 3.00 metres.Redbridge 1539/26 · All Other
Jun 2026 450 m away
Approved
153, Brian Road, RM6 5BSSingle storey side extension. (Summary).Redbridge 1407/26 · All Other
May 2026 400 m away
Refused
75, Freshwell Avenue, RM6 5DRChange of use from a single dwellinghouse to a small HMO for up to 6 people (Retrospective). (Summary)Redbridge 0815/26 · All Other · 1 homes proposed
May 2026 50 m away
Application Under Consideration
60, Billet Road, RM6 5SUChange of use from c3 dwelling to c4 small HMORedbridge 0809/26 · All Other · 1 homes proposed
May 2026 450 m away
Application Under Consideration
189, Barley Lane, RM6 4XUTwo storey side extension and part first floor rear extensionRedbridge 1203/26 · Householder
May 2026 300 m away
Approved
47, Freshwell Avenue, RM6 5DS47 FRESHWELL AVENUE (CLP LOFT)Redbridge 1188/26 · All Other
May 2026 150 m away
Approved
179, Somerville Road, RM6 5AULoft conversion with a rear dormer incorporating a Juliet balcony. Hip to gable roof alterations. Three front rooflights. (Summary).Redbridge 0743/26 · All Other
Apr 2026 500 m away
Approved
187, Somerville Road, RM6 5AUConstruction of a first floor rear extension with hipped roofRedbridge 0842/26 · Householder
Mar 2026 500 m away
Approved
310, Chadwell Heath Lane, RM6 4YH310 CHADWELL HEATH LANE, RM6 4YHRedbridge 0792/26 · All Other
Mar 2026 150 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Sept 2024 5.4 km away
Rooftop solar
Roding Lane South - Solar PanelsApproved, not yet built · 220 kW
Dec 2022 5.4 km away
Rooftop solar
Dagenham Motors, Ripple Road - Solar PanelsApproved, not yet built · 250 kW
Jun 2023 5.5 km away
Running nearest: Bower Park Academy - Solar Photovoltaic Panels (rooftop solar, 5.0 km); Ford Motor Company Ltd (Extension) (wind farm, 6.3 km); Dagenham Docks Biogas (Waste AD) (anaerobic digestion, 6.5 km); Beckton Sewage Treatment Works (wind farm, 6.8 km); Beckton STW Enhanced Sludge Digestion (other, 6.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Other Pipe-lines · Between Belvedere, Bexley and Pimlico, Westminster
Tilbury2Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury
decided Feb 2019 22.9 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.