Country England and Wales › Region East of England › Council Epping Forest › Neighbourhood Theydon Bois & Abridge › Postcode RM4 1DH What's changing near RM4 1DH Within 2 km, around Theydon Bois & Abridge in Epping Forest. Building, planning, schools, transport, prices and crime.
4 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
-9.4% like-for-like prices in Theydon Bois & Abridge, 2024 → 2025 (council -0.3%)
-1% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
10 homes extended 2021–2025, typically adding 35 m²
24 since energy certificates began (2008)
1 in RM4 1DH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
635 hours of spills in 2025 between them (typical neighbourhood: about 36)
85 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 20 planned, approved or being built and 2 running (2 MW between them). Those within 5 km are on the map above.
Rooftop solar Aerzen House, Langston Road - Solar Panels Approved, not yet built · 150 kW
Jan 2025 2.1 km away Solar farm Thrift Solar Farm and BESS Approved, not yet built · 30 MW
Dec 2025 5.5 km away Battery storage Thrift Solar Farm and BESS Approved, not yet built · 30 MW
Dec 2025 5.5 km away Solar farm Nickerlands Solar Farm - Solar Farm Approved, not yet built · 25 MW
Feb 2025 6.5 km away Rooftop solar Roding Primary School and Nursery, Roding Lane North - Solar Panels Approved, not yet built · 150 kW
Jun 2026 6.8 km away Rooftop solar King George Hospital, Barley Lane - Solar Photovoltaic Panels Planning application in · 770 kW
Jan 2026 7.7 km away Rooftop solar William Torbitt School, Eastern Avenue - Solar Panels Planning application in · 170 kW
May 2026 8.0 km away Rooftop solar Woodbridge High School, St Barnabas Road - Solar Panels Approved, not yet built · 540 kW
Oct 2024 8.1 km away Rooftop solar The Scout Association, Gilwell Park - Solar Panels Approved, not yet built · 150 kW
Nov 2025 8.1 km away Rooftop solar Maybank Road - Solar Panels Approved, not yet built · 160 kW
Aug 2025 8.1 km away Road and street works within 1 km 5 permitted works running now or planned, 2 of them major.
Major, planned Hoe Lane, Lambourne Utility repair and maintenance works · UK POWER NETWORKS EASTERN & LONDON · Road closure
Nov 2026 to Nov 2026 250 m away Major Hoe Lane, Lambourne Utility repair and maintenance works · UK POWER NETWORKS EASTERN & LONDON · Road closure
Oct 2026 to Oct 2026 250 m away Standard Ongar Road, Lambourne Utility repair and maintenance works · AFFINITY WATER - C · Two-way signals
Nov 2026 to Nov 2026 300 m away Minor Ongar Road, Lambourne Highway improvement works · ESSEX COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026 450 m away Minor London Road, Lambourne Highway improvement works · ESSEX COUNTY COUNCIL · Multi-way signals
Nov 2026 to Nov 2026 1000 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided May 2022 10.3 km away Decided decided Feb 2017 11.6 km away Decided decided Apr 2014 12.6 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020 16.2 km away Decided decided Nov 2025 16.3 km away Decided Silvertown Tunnel Highways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018 18.1 km away Pre-application Transport schemes within 20 km Running nearest: Bower Park Academy - Solar Photovoltaic Panels (rooftop solar, 6.4 km); Waltham Point Distribution Centre (rooftop solar, 9.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.