Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
9storm overflows within 2 km
202hours of spills in 2025 between them (typical neighbourhood: about 36)
123spill events counted
Anglian Water
Tilbury Water Recycling Centreinto Ouse (Newport Pagnell To Roxton)64 spills, 142 hours in 2025
1.2 km away
Southern Water
Singlewell Road Gravesend 123 Csointo Tidal River Thames3 spills, 22 hours in 2025
1.6 km away
Southern Water
Milton Road Gravesend Csointo Tidal River Thames11 spills, 17 hours in 2025
1.8 km away
Southern Water
Old Road West Gravesend Csointo Tidal River Thames16 spills, 10 hours in 2025
Intu Lakeside, West Thurrock Way - Solar PanelsApproved, not yet built · 1 MW
Sept 2024 6.8 km away
Battery storage
Pumping Station, West Thurrock Way - Micro Energy StorageApproved, not yet built · 200 kW
Oct 2024 7.0 km away
Running nearest: Thurrock Flexible Generation Plant (battery storage, 900 m); Port of Tilbury Green Hydrogen (hydrogen, 1.4 km); Tilbury LCY2 (rooftop solar, 1.5 km); London Distribution Park (battery storage, 1.5 km); Tilbury Green Power (biomass, 1.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.