Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
142hours of spills in 2025 between them (typical neighbourhood: about 36)
64spill events counted
Anglian Water
Tilbury Water Recycling Centreinto Ouse (Newport Pagnell To Roxton)64 spills, 142 hours in 2025
New Barn Road - Battery Energy Storage FacilityApproved, not yet built · 35 MW
Feb 2024 6.5 km away
Battery storage
Pumping Station, West Thurrock Way - Micro Energy StorageApproved, not yet built · 200 kW
Oct 2024 6.6 km away
Running nearest: Tilbury LCY2 (rooftop solar, 1.1 km); London Distribution Park (battery storage, 1.1 km); Thurrock Flexible Generation Plant (battery storage, 1.4 km); Tilbury Green Power (biomass, 1.6 km); Port of Tilbury Green Hydrogen (hydrogen, 1.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.