Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Tesco, Cygnet View - Solar PV ArraysApproved, not yet built · 1 MW
Mar 2026 5.9 km away
Solar farm
Clay Tye Road - Solar FarmPlanning application in · 50 MW
Apr 2021 5.9 km away
Running nearest: Tilbury LCY2 (rooftop solar, 2.9 km); London Distribution Park (battery storage, 2.9 km); Tilbury Green Power (biomass, 3.7 km); Port of Tilbury Green Hydrogen (hydrogen, 4.0 km); Ockendon 'B' Landfill Scheme (landfill gas, 4.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.