What's changing near RM16 2LJ
Within 2 km, around Little Thurrock North in Thurrock. Building, planning, schools, transport, prices and crime.
57new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+6.6%like-for-like prices in Little Thurrock North, 2024 → 2025 (council +2.4%)
+16%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
15homes extended 2021–2025, typically adding 37 m²
31since energy certificates began (2008)
1in RM16 2LJ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
38 planned, approved or being built and 25 running (493 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Morrisons - Solar Photovoltaic PanelsApproved, not yet built · 430 kW
Apr 2022
2.7 km away - Rooftop solar
Tilbury Green Power Station - Solar PV PanelsApproved, not yet built · 300 kW
Feb 2025
3.2 km away - Battery storage
Pumping Station, Corran Way - Micro Energy Storage SystemApproved, not yet built · 200 kW
Jan 2025
3.3 km away - Rooftop solar
Harris Academy Chafford Hundred, Chafford Hundred - Solar AarrayApproved, not yet built · 220 kW
Mar 2025
3.7 km away - Rooftop solar
Intu Lakeside, West Thurrock Way - Solar PanelsApproved, not yet built · 1 MW
Sept 2024
4.0 km away - Solar farm
Bulphan Fen Solar Farm & Battery StorageBeing built · 50 MW
Mar 2025
4.4 km away - Battery storage
Bulphan Fen Solar Farm & Battery StorageBeing built
Mar 2025
4.4 km away - Rooftop solar
Tesco, Cygnet View - Solar PV ArraysApproved, not yet built · 1 MW
Mar 2026
4.5 km away - Battery storage
Pumping Station, West Thurrock Way - Micro Energy StorageApproved, not yet built · 200 kW
Oct 2024
4.5 km away - Solar farm
Clay Tye Road - Solar FarmPlanning application in · 50 MW
Apr 2021
4.8 km away - Solar farm
Road and street works within 1 km
4 permitted works running now or planned.
- Standard
Orsett Cock Roundabout, OrsettOptional permit (no fee) e.g. for traffic management etc · NATIONAL HIGHWAYS · No carriageway incursion
Jan 2027 to Jan 2027
600 m away - Minor
Blackshots Lane, GraysRemedial works · ESSEX AND SUFFOLK WATER · Multi-way signals
Oct 2026 to Oct 2026
100 m away - Minor
Jesmond Road, GraysHighway repair and maintenance works · THURROCK COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026
750 m away - Minor
Springfield Road, GraysHighway repair and maintenance works · THURROCK COUNCIL · Stop/go boards
Oct 2026 to Oct 2026
800 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Mar 2025
1.1 km away - Decided
Tilbury2Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019
5.6 km away - Decideddecided Feb 2022
5.6 km away - Decideddecided Nov 2025
12.4 km away - Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
12.8 km away - Decideddecided May 2022
13.7 km away - Decided
Transport schemes within 20 km
Running nearest: Ockendon 'B' Landfill Scheme (landfill gas, 2.5 km); Ockendon Area III (landfill gas, 3.2 km); Ockendon Landfill Solar Farm (solar farm, 3.3 km); Medebridge Road - Solar Farm (solar farm, 3.4 km); Tilbury LCY2 (rooftop solar, 3.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.