Country England and Wales › Region East of England › Council Thurrock › Neighbourhood North Ockendon › Postcode RM15 6TA What's changing near RM15 6TA Within 2 km, around North Ockendon in Thurrock. Building, planning, schools, transport, prices and crime.
2 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+1.6% like-for-like prices in North Ockendon, 2024 → 2025 (council +2.4%)
+5% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 2 postcodes nearby had new homes completed in the last two years.
10 homes extended 2021–2025, typically adding 28 m²
19 since energy certificates began (2008)
0 in RM15 6TA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 41 planned, approved or being built and 28 running (602 MW between them). Those within 5 km are on the map above.
Battery storage Pumping Station, Corran Way - Micro Energy Storage System Approved, not yet built · 200 kW
Jan 2025 2.0 km away Solar farm Clay Tye Road - Solar Farm Planning application in · 50 MW
Apr 2021 3.0 km away Solar farm Fen Lane, Bulphan Solar Farm Being built · 50 MW
Jul 2021 3.0 km away Rooftop solar Tesco, Cygnet View - Solar PV Arrays Approved, not yet built · 1 MW
Mar 2026 3.6 km away Rooftop solar Intu Lakeside, West Thurrock Way - Solar Panels Approved, not yet built · 1 MW
Sept 2024 3.6 km away Battery storage Clay Tye Farm - Energy Storage Facility Planning application in · 200 MW
May 2026 3.7 km away Solar farm Bulphan Fen Solar Farm & Battery Storage Being built · 50 MW
Mar 2025 3.7 km away Battery storage Bulphan Fen Solar Farm & Battery Storage Being built
Mar 2025 3.7 km away Rooftop solar Harris Academy Chafford Hundred, Chafford Hundred - Solar Aarray Approved, not yet built · 220 kW
Mar 2025 4.1 km away Battery storage Pumping Station, West Thurrock Way - Micro Energy Storage Approved, not yet built · 200 kW
Oct 2024 4.1 km away Rooftop solar Road and street works within 1 km 5 permitted works running now or planned, 3 of them major.
Major Copper Beech Road, South Ockendon Permanent reinstatement · ESSEX AND SUFFOLK WATER · Road closure
Jan 2027 to Jan 2027 300 m away Major, planned Rosemary Close, South Ockendon Utility asset works · BT · Road closure
Nov 2026 to Nov 2026 600 m away Major, planned Orchard Road, South Ockendon Utility repair and maintenance works · UK POWER NETWORKS EASTERN & LONDON · Road closure
Nov 2026 to Dec 2026 900 m away Minor Larkspur Close, South Ockendon Utility repair and maintenance works · ESSEX AND SUFFOLK WATER · No carriageway incursion
Oct 2026 to Oct 2026 450 m away Minor Rosemary Close, South Ockendon Utility repair and maintenance works · ESSEX AND SUFFOLK WATER · Some carriageway incursion
Oct 2026 to Oct 2026 550 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Mar 2025 4.2 km away Decided Tilbury2 Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019 9.0 km away Decided decided Feb 2022 9.0 km away Decided decided Nov 2025 9.7 km away Decided Riverside Energy Park Generating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020 10.1 km away Decided decided May 2022 10.7 km away Decided Transport schemes within 20 km Running nearest: Medebridge Road - Solar Farm (solar farm, 950 m); Ockendon 'B' Landfill Scheme (landfill gas, 1.1 km); Little Belhus Restoration Site (wind farm, 1.5 km); Ockendon Area III (landfill gas, 1.6 km); Ockendon Landfill Solar Farm (solar farm, 1.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.