What's changing near RM15 6NN
Within 2 km, around North Ockendon in Thurrock. Building, planning, schools, transport, prices and crime.
2new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.6%like-for-like prices in North Ockendon, 2024 → 2025 (council +2.4%)
+5%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
No new homes (5+ in a postcode), planning permissions or school changes recorded within 2 km.
New-home postcodes with fewer than 5 homes are counted above but not listed. 2 postcodes nearby had new homes completed in the last two years.
9homes extended 2021–2025, typically adding 19 m²
15since energy certificates began (2008)
0in RM15 6NN itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
45 planned, approved or being built and 29 running (608 MW between them). Those within 5 km are on the map above.
- Battery storage
Pumping Station, Corran Way - Micro Energy Storage SystemApproved, not yet built · 200 kW
Jan 2025
2.3 km away - Solar farm
Clay Tye Road - Solar FarmPlanning application in · 50 MW
Apr 2021
2.9 km away - Solar farm
Fen Lane, Bulphan Solar FarmBeing built · 50 MW
Jul 2021
3.0 km away - Battery storage
Clay Tye Farm - Energy Storage FacilityPlanning application in · 200 MW
May 2026
3.5 km away - Solar farm
Bulphan Fen Solar Farm & Battery StorageBeing built · 50 MW
Mar 2025
3.7 km away - Battery storage
Bulphan Fen Solar Farm & Battery StorageBeing built
Mar 2025
3.7 km away - Rooftop solar
Tesco, Cygnet View - Solar PV ArraysApproved, not yet built · 1 MW
Mar 2026
3.8 km away - Rooftop solar
Intu Lakeside, West Thurrock Way - Solar PanelsApproved, not yet built · 1 MW
Sept 2024
3.8 km away - Rooftop solar
Tesco Store Cygnet ViewApproved, not yet built · 600 kW
Apr 2019
4.2 km away - Battery storage
Pumping Station, West Thurrock Way - Micro Energy StorageApproved, not yet built · 200 kW
Oct 2024
4.3 km away - Rooftop solar
Harris Academy Chafford Hundred, Chafford Hundred - Solar Aarray
Road and street works within 1 km
4 permitted works running now or planned, 2 of them major.
- Major
Copper Beech Road, South OckendonPermanent reinstatement · ESSEX AND SUFFOLK WATER · Road closure
Jan 2027 to Jan 2027
100 m away - Major, planned
Rosemary Close, South OckendonUtility asset works · BT · Road closure
Nov 2026 to Nov 2026
300 m away - Minor
Larkspur Close, South OckendonUtility repair and maintenance works · ESSEX AND SUFFOLK WATER · No carriageway incursion
Oct 2026 to Oct 2026
150 m away - Minor
Rosemary Close, South OckendonUtility repair and maintenance works · ESSEX AND SUFFOLK WATER · Some carriageway incursion
Oct 2026 to Oct 2026
250 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Mar 2025
4.5 km away - Decided
Tilbury2Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury decided Feb 2019
9.3 km away - Decideddecided Feb 2022
9.4 km away - Decideddecided Nov 2025
9.6 km away - Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
10.0 km away - Decideddecided May 2022
10.4 km away - Decided
Transport schemes within 20 km
Running nearest: Medebridge Road - Solar Farm (solar farm, 1.1 km); Little Belhus Restoration Site (wind farm, 1.2 km); Ockendon 'B' Landfill Scheme (landfill gas, 1.4 km); Ockendon Area III (landfill gas, 1.7 km); Ockendon Landfill Solar Farm (solar farm, 1.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.