Within 2 km, around Rise Park in Havering. Building, planning, schools, transport, prices and crime.
403new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+1.6%like-for-like prices in Rise Park, 2024 → 2025 (council +3.4%)
-16%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New homes
31 new homes completedflats · Aug 2026
Aug 2026 1.8 km away
New homes
56 new homes completedflats · Aug 2026
Aug 2026 1.8 km away
New homes
35 new homes completedflats · Aug 2026
Aug 2026 1.8 km away
New homes
9 new homes completedflats · May 2026
May 2026 1.7 km away
New homes
85 new homes completedflats · Apr 2026
Apr 2026 1.8 km away
New homes
54 new homes completedflats · Apr 2026
Apr 2026 1.8 km away
New homes
19 new homes completedflats · Oct 2025
Oct 2025 1.8 km away
New homes
71 new homes completedflats · Oct 2025
Oct 2025 1.8 km away
New homes
6 new homes completedflats · Mar 2025 – Apr 2025
Apr 2025 1.3 km away
New homes
7 new homes completedflats · Mar 2025
Mar 2025 1.5 km away
New homes
5 new homes completedhouses · Feb 2025
Feb 2025 1.4 km away
New homes
7 new homes completed5 flats, 2 houses · Nov 2024
Nov 2024 1.9 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 23 postcodes nearby had new homes completed in the last two years.
Planning applications within 500 m
25applications in the last 12 months
13approved · 1 refused
7still being decided
0net new homes in approved schemes since 2023
Application Under Consideration
25, 25 Netherpark Drive, Netherpark Drive, RM2 5RJConstruction of part first floor rear extensionHavering P1144.26 · Householder
Oct 2026 300 m away
Application Under Consideration
1, 1 The Elkins, Romford, RM1 4HTErection of one, 4-bed detached dwelling with associated cycle store, waste/refuse, amenity space and front boundary.Havering P1086.26 · All Other · 1 homes proposed
Sept 2026 400 m away
Application Under Consideration
124 Beauly Way, Romford, RM1 4XLSingle storey flat roof rear extension, internal alterations, removal of existing chimneys, finishing of exterior in external wall insulation and render.Havering P1049.26 · All Other
Sept 2026 250 m away
Application Under Consideration
20 Millbrook Gardens, Gidea Park, Romford, RM2 5RPCertificate of Lawfulness for rear dormer extension incorporating a Juliet balcony. Hip to gable roof alterations. Front roof lightsHavering D0349.26 · All Other
Sept 2026 250 m away
Application Under Consideration
39 & 41 Reed Pond Walk, Romford, RM2 5PDReplacement garages to serve Nos. 39 and 41 Reed Pond WalkHavering P0765.26 · All Other
Aug 2026 450 m away
Refused
25 Netherpark Drive, Romford, RM2 5RJGround floor rear extension, part two-storey rear extension, hip to gable roof enlargement over approved two-storey side extension and first floor front extension.Havering P0927.26 · All Other
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
17 The Elkins, Romford, RM1 4HTPart two storey, part single storey rear extension and alterations to fenestrationHavering P0873.26 · All Other
Aug 2026 350 m away
Application Under Consideration
7 Reed Pond Walk, Romford, RM2 5PJErection of a single-storey rear extension with a flat roof incorporating rooflights and associated internal alterations.Havering P0799.26 · All Other
Jun 2026 350 m away
Approved
25, 25 Netherpark Drive, Romford, RM2 5RJGround floor rear extensionHavering P0730.26 · All Other
Jun 2026 300 m away
Approved
316, 316 Eastern Avenue East, Romford, RM2 5RASingle storey rear extension, alterations to ground floor side fenestration and to existing rear steps following demolition of existing garageHavering P0661.26 · All Other
Jun 2026 200 m away
Not Required
25, 25 Netherpark Drive, Romford, RM2 5RJCertificate of Lawfulness for a hip to gable loft conversion with rear dormer and roof light to frontHavering D0233.26 · All Other
Jun 2026 300 m away
Approved
Brookside, Heaton Grange Road, Romford, RM2 5PPProposed outbuilding incidental use to main house and in-ground swimming poolHavering P0627.26 · All Other
May 2026 250 m away
Approved
48, 48 Brook Road, Romford, RM2 5QTInstallation of a summer house to rear gardenHavering P0542.26 · All Other
Apr 2026 150 m away
Not Required
24, 24 Millbrook Gardens, Gidea Park, RM2 5RPCertificate of Lawfulness for a proposed development of loft conversion involving rear dormer windows and roof lightsHavering D0164.26 · All Other
Apr 2026 300 m away
Approved
25, 25 Netherpark Drive, Romford, RM2 5RJTwo storey side extension involving part demolition of existing attached garage.Havering P0481.26 · All Other
Apr 2026 300 m away
Approved
27, 27 Dee Way, Romford, RM1 4XASINGLE STOREY REAR/PART SIDE EXTENSIONHavering P0474.26 · All Other
Apr 2026 400 m away
Not Required
1, 1 The Elkins, Romford, RM1 4HTCertificate of lawfulness for proposed change of use from class C3(a) (dwellinghouse) to class C3(b) (supported living) for up to 4 residents (18 -65years) with care provided by up to 2 support workers.Havering D0148.26 · All Other
Apr 2026 400 m away
Not Required
17, 17 The Elkins, Romford, RM1 4HTCertificate of lawfulness for proposed loft conversion with rear dormer and front roof lightsHavering D0144.26 · All Other
Apr 2026 350 m away
Approved
62, 62 Heath Drive, Romford, RM2 5QRProposed Garage Conversion and Minor Remedial WorksHavering P0378.26 · All Other
Mar 2026 450 m away
Approved
3, 3 Dee Way, Romford, RM1 4XASingle/two storey rear extension (part retrospective), proposed part two storey, part single storey side extension and single storey front extension and retention of hip-to-gable roof conversion and rear dormerHavering P0232.26 · All Other
Mar 2026 350 m away
Approved
312, 312 Eastern Avenue East, Romford, RM2 5RASingle storey rear extensionHavering P0152.26 · All Other
Mar 2026 200 m away
Approved
24 Millbrook Gardens, Gidea Park, Romford, RM2 5RPSingle storey rear extensionHavering P0007.26 · All Other
Jan 2026 300 m away
Approved
33 Brook Road, Romford, RM2 5QSRetrospective application for replacement of fenestration and fencing and new drivewayHavering P1317.25 · All Other
Dec 2025 250 m away
Approved
8 Reed Pond Walk, Romford, RM2 5PBPart single, part two storey rear extension.Havering P1550.25 · All Other
Dec 2025 500 m away
Approved
1A The Elkins, Romford, RM1 4HTPROPOSED PART DROP KERBHavering P1351.25 · All Other
Oct 2025 450 m away
Source: Planning London Datahub (Greater London Authority and the London boroughs); applications validated since January 2023. Data is published as received and may contain errors; check the borough's planning portal for documents.
Rooftop solar
Peri Limited, Greenways - Solar PhotovoltaicsApproved, not yet built · 460 kW
Dec 2022 7.9 km away
Rooftop solar
Goresbrook School, Cook Road - Solar PanelsApproved, not yet built · 370 kW
May 2026 7.9 km away
Running nearest: Bower Park Academy - Solar Photovoltaic Panels (rooftop solar, 1.3 km); Cranham Golf Course Solar Park (solar farm, 7.6 km); Ford Motor Company Ltd (Extension) (wind farm, 7.7 km); Dagenham Docks Biogas (Waste AD) (anaerobic digestion, 8.6 km); Riverside Sewage Treatment Works Digestion Plant (other, 8.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Tilbury2Harbour Facilities · Site of the former Tilbury Power Station, approximately 1 km east of the existing Port of Tilbury
decided Feb 2019 20.3 km away
Decided
Thurrock Flexible Generation PlantGenerating Stations · North of the existing Tilbury National Grid substation, off Station Road, Thurrock, RM18 8UL
decided Feb 2022 20.4 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.