What's changing near RM10 9DG
Within 2 km, around Rylands Estate & Dagenham Dock in Barking and Dagenham. Building, planning, schools, transport, prices and crime.
409new homes completed within 2 km, last 2 years
6,621homes given permission on brownfield sites since 2021
-3.1%like-for-like prices in Rylands Estate & Dagenham Dock, 2024 → 2025 (council +2.4%)
+10%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
82 new homes completedflats · Sep 2026
Sept 2026
550 m away - New homes
52 new homes completedflats · Feb 2026
Feb 2026
400 m away - New homes
91 new homes completedflats · Jan 2026
Jan 2026
1.1 km away - New schoolSept 2025
1.8 km away - New homes
65 new homes completedflats · Dec 2024 – Feb 2025
Feb 2025
300 m away - New homes
77 new homes completedflats · Dec 2024 – Feb 2025
Feb 2025
350 m away - New homes
7 new homes completedflats · Dec 2024
Jan 2025
350 m away - Planning permission
Permission for 3119 homesBeam Park (outline planning permission)
Nov 2023
500 m away - Planning permission
Permission for 3502 homesFormer Ford Stamping Plant (outline planning permission)
Oct 2022
350 m away
New-home postcodes with fewer than 5 homes are counted above but not listed. 27 postcodes nearby had new homes completed in the last two years.
Planning applications within 500 m
24applications in the last 12 months
6approved · 4 refused
14still being decided
1net new homes in approved schemes since 2023
- Application Under Consideration
607, 36, UNION HOUSE, NEW ROAD, RM9 6GRApplication for a lawful development certificate (proposed) for the use of the dwelling for childmindingBarking & Dagenham 26/01304/CLUP · Householder
Sept 2026
350 m away - Application Under Consideration
8, REVIEW ROAD, RM10 9DHPrior notification application for the construction of a single storey rear extension. The proposed extension will extend beyond the rear wall by 6.00 metres. The maximum height of the proposed extension from the natural ground level is 3.50 metres. The height at eaves level of the proposed extension measured from the natural ground level is 3.00 metres. Barking & Dagenham 26/01258/PRIEXT · Householder
Sept 2026
250 m away - Application Under Consideration
71, ORCHARD ROAD, RM10 9PUPrior notification application for the construction of a single storey rear extension. The proposed extension will extend beyond the rear wall by 6.00 metres. The maximum height of the proposed extension from the natural ground level is 3.00 metres. The height at eaves level of the proposed extension measured from the natural ground level is 2.92 metres.Barking & Dagenham 26/01256/PRIEXT · Householder
Sept 2026
400 m away - Application Under Consideration
27, MARSH GREEN ROAD, RM10 9PRDemolition of existing conservatory and canopy and the construction of a single storey front extension and front porch, the construction of a part two storey part single storey rear and side extension and the construction of a rear dormer extension including three roof lights to the front and one to the rear to facilitate conversion of roof space into habitable accommodationBarking & Dagenham 26/01219/HSE · Householder
Sept 2026
400 m away - Application Under Consideration
31homes extended 2021–2025, typically adding 22 m²
52since energy certificates began (2008)
3in RM10 9DG itself
- Extendedcertificate 2020
- Extendedcertificate 2019
- Extendedcertificate 2019
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
66 planned, approved or being built and 27 running (313 MW between them). Those within 5 km are on the map above.
- Rooftop solar
JJ Food Service, Orion Park Messina Way - Solar PanelsApproved, not yet built · 570 kW
Nov 2023
650 m away - Rooftop solar
Thames Gateway Park, Choats Road - Solar PanelsApproved, not yet built · 470 kW
Jun 2023
1.1 km away - Rooftop solar
Pooles Lane - Solar PV PanelsApproved, not yet built · 350 kW
Aug 2025
1.1 km away - Energy from waste
Thames Gateway EfWApproved, not yet built · 19 MW
Nov 2014
1.4 km away - Energy from waste
Connect Waste (Chequers Lane)Planning application in · 20 MW
Mar 2020
1.5 km away - Rooftop solar
Goresbrook School, Cook Road - Solar PanelsApproved, not yet built · 370 kW
May 2026
1.7 km away - Rooftop solar
Ceme Campus, Marsh Way - Solar PV PanelsApproved, not yet built · 910 kW
Apr 2023
1.8 km away - Rooftop solar
Hunters Hall Primary School, Alibon Road - Solar PanelsApproved, not yet built · 250 kW
Jul 2024
1.9 km away - Battery storage
Riverside Resource Recovery Facility Battery StorageBeing built · 3 MW
Dec 2020
2.8 km away - Anaerobic digestion
Riverside Energy Park (REP)Approved, not yet built · 19 MW
Apr 2020
2.9 km away - Energy from waste
Road and street works within 1 km
2 permitted works running now or planned.
- Minor
Ballards Road, DagenhamUtility asset works · VIRGIN MEDIA · Some carriageway incursion
Oct 2026 to Oct 2026
400 m away - Minor
School Road, DagenhamUtility repair and maintenance works · ESSEX AND SUFFOLK WATER · Some carriageway incursion
Oct 2026 to Oct 2026
450 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decided
Riverside Energy ParkGenerating Stations · Immediately to the west of the existing Riverside Resource Recovery Facility,Bexley, London decided Apr 2020
2.8 km away - Decideddecided Nov 2025
2.9 km away - Decided
Silvertown TunnelHighways · The new road tunnel will pass under the River Thames between Silvertown and North Greenwich decided May 2018
10.4 km away - Decideddecided May 2022
11.5 km away - Pre-applicationapplication due March 2028
11.6 km away - Decideddecided Mar 2025
14.1 km away - Decided
Transport schemes within 20 km
135, THIRD AVENUE, RM10 9BDPrior notification application for the construction of a single storey rear extension. The proposed extension will extend beyond the rear wall by 5.50 metres. The maximum height of the proposed extension from the natural ground level is 3.00 metres. The height at eaves level of the proposed extension measured from the natural ground level is 2.80 metres.Barking & Dagenham 26/01212/PRIEXT · Householder
Running nearest: Ford Motor Company Ltd (Extension) (wind farm, 300 m); Ford Wind Park - Dagenham (wind farm, 1.3 km); Dagenham Docks Biogas (Waste AD) (anaerobic digestion, 1.4 km); East Dagenham Docks AD (AD) (anaerobic digestion, 1.5 km); Riverside Sewage Treatment Works Digestion Plant (other, 2.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.