Country England and Wales › Region South East › Council Reigate and Banstead › Neighbourhood Horley West › Postcode RH6 8HA What's changing near RH6 8HA Within 2 km, around Horley West in Reigate and Banstead. Building, planning, schools, transport, prices and crime.
48 new homes completed within 2 km, last 2 years
28 homes given permission on brownfield sites since 2021
+2.7% like-for-like prices in Horley West, 2024 → 2025 (council +1.1%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 8 new homes completed 6 flats, 2 houses · Sep 2025
Sept 2025 1.2 km away New homes 6 new homes completed flats · Sep 2025
Sept 2025 1.5 km away Planning permission Apr 2025 1.5 km away New homes 18 new homes completed 8 flats, 10 houses · Mar 2025
Mar 2025 1.9 km away Planning permission Nov 2023 1.3 km away Planning permission Permission for 10 homes Mitchells Of Horley Ltd, Victory Works, 1 - 9 Station Road, Horley, Surrey, RH6 9HW (full planning permission) Sept 2023 1.4 km away New school Sept 2020 700 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
14 homes extended 2021–2025, typically adding 37 m²
34 since energy certificates began (2008)
0 in RH6 8HA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
836 hours of spills in 2025 between them (typical neighbourhood: about 36)
59 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 20 planned, approved or being built and 4 running (6 MW between them). Those within 5 km are on the map above.
Rooftop solar Tesco Extra, Reigate Road - Solar Panels Approved, not yet built · 380 kW
Mar 2026 1.5 km away Battery storage South Terminal Car Park Forecourt - Electric Vehicle Charging Forecourt Being built
Sept 2022 1.5 km away Solar farm Duxhurst Farm, Duxhurst Lane - Solar Farm Approved, not yet built
Dec 2023 2.1 km away Battery storage Duxhurst Farm, Duxhurst Lane - Solar Farm Approved, not yet built
Dec 2023 2.1 km away Solar farm Gatwick House, Pound Hill - Solar Panels Planning application in · 160 kW
Jul 2023 4.0 km away Rooftop solar East Surrey Hospital, Canada Avenue -Solar Panels Approved, not yet built · 2 MW
Nov 2025 4.4 km away Rooftop solar Welland Medical, Hydehurst Lane - Solar Panels Approved, not yet built · 940 kW
Oct 2022 4.8 km away Rooftop solar Elekta Limited, Fleming Way - Solar Panels Approved, not yet built · 350 kW
Nov 2025 5.2 km away Battery storage Woodhatch Place, Cockshot Hill - Micro Energy Storage System Approved, not yet built · 200 kW
Oct 2024 5.2 km away Rooftop solar Yodel, County Oak Way - Solar Panels Approved, not yet built · 220 kW
Aug 2024 5.2 km away Road and street works within 1 km 4 permitted works running now or planned, 2 of them major.
Major, planned Meath Green Lane, Horley Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Feb 2027 to Feb 2027 200 m away Major Meath Green Lane, Horley Works for road purposes · SURREY COUNTY COUNCIL · Road closure
Sept 2026 to Oct 2026 700 m away Standard Yew Tree Close, Horley Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Nov 2026 to Nov 2026 550 m away Standard Benhams Drive, Horley Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Nov 2026 to Dec 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Sept 2025 3.0 km away Decided decided May 2022 24.7 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Redhill 2 (landfill gas, 6.5 km); Patteson Court Landfill Site (landfill gas, 7.3 km); Oriel High School (rooftop solar, 8.5 km); Majors Hill/Turners Hill Solar Farm (solar farm, 9.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.