Country England and Wales › Region South East › Council Reigate and Banstead › Neighbourhood Salfords & Woodhatch › Postcode RH6 0HL What's changing near RH6 0HL Within 2 km, around Salfords & Woodhatch in Reigate and Banstead. Building, planning, schools, transport, prices and crime.
37 new homes completed within 2 km, last 2 years
6 homes given permission on brownfield sites since 2021
+4.5% like-for-like prices in Salfords & Woodhatch, 2024 → 2025 (council +1.1%)
+2% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 8 new homes completed houses · May 2026 – Jun 2026
Jun 2026 2.0 km away New homes 18 new homes completed 8 flats, 10 houses · Mar 2025
Mar 2025 950 m away Planning permission Permission for 6 homes R & C Capstick Ltd, Brittleware Farm Building, Norwoodhill Road, Charlwood, Surrey, RH6 0EB (outline planning permission) Jun 2023 1.9 km away New school Sept 2020 850 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
3 homes extended 2021–2025, typically adding 31 m²
4 since energy certificates began (2008)
1 in RH6 0HL itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
836 hours of spills in 2025 between them (typical neighbourhood: about 36)
59 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 20 planned, approved or being built and 3 running (5 MW between them). Those within 5 km are on the map above.
Solar farm Duxhurst Farm, Duxhurst Lane - Solar Farm Approved, not yet built
Dec 2023 850 m away Battery storage Duxhurst Farm, Duxhurst Lane - Solar Farm Approved, not yet built
Dec 2023 850 m away Rooftop solar Tesco Extra, Reigate Road - Solar Panels Approved, not yet built · 380 kW
Mar 2026 1.9 km away Battery storage South Terminal Car Park Forecourt - Electric Vehicle Charging Forecourt Being built
Sept 2022 2.7 km away Rooftop solar East Surrey Hospital, Canada Avenue -Solar Panels Approved, not yet built · 2 MW
Nov 2025 4.5 km away Battery storage Woodhatch Place, Cockshot Hill - Micro Energy Storage System Approved, not yet built · 200 kW
Oct 2024 4.5 km away Solar farm Little Flanchford Farm, Flanchford Road - Solar Energy Planning application in · 20 MW
Nov 2024 4.6 km away Solar farm Gatwick House, Pound Hill - Solar Panels Planning application in · 160 kW
Jul 2023 5.2 km away Rooftop solar Welland Medical, Hydehurst Lane - Solar Panels Approved, not yet built · 940 kW
Oct 2022 5.4 km away Rooftop solar Yodel, County Oak Way - Solar Panels Approved, not yet built · 220 kW
Aug 2024 5.5 km away Road and street works within 1 km 1 permitted works running now or planned, 1 of them major.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Sept 2025 3.5 km away Decided decided May 2022 23.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Redhill 2 (landfill gas, 6.6 km); Patteson Court Landfill Site (landfill gas, 7.3 km); Oriel High School (rooftop solar, 9.1 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.