Country England and Wales › Region South East › Council Mid Sussex › Neighbourhood East Grinstead Central & North › Postcode RH19 1PY What's changing near RH19 1PY Within 2 km, around East Grinstead Central & North in Mid Sussex. Building, planning, schools, transport, prices and crime.
45 new homes completed within 2 km, last 2 years
7 homes given permission on brownfield sites since 2021
0.0% like-for-like prices in East Grinstead Central & North, 2024 → 2025 (council +2.0%)
-0% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 12 new homes completed flats · Apr 2025 – May 2026
May 2026 1.5 km away New homes 9 new homes completed flats · Jun 2025
Jun 2025 900 m away New homes 10 new homes completed flats · Oct 2024
Oct 2024 600 m away Planning permission Oct 2022 1.5 km away New school New school: Blackwell Primary School Academy sponsor led, primary
Sept 2020 1.3 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
12 homes extended 2021–2025, typically adding 26 m²
41 since energy certificates began (2008)
10 in RH19 1PY itself
Extended certificate 2025 Extended certificate 2022 Extended certificate 2021 Extended certificate 2020 Extended certificate 2019 Extended Storm overflows within 2 km 5 storm overflows within 2 km
290 hours of spills in 2025 between them (typical neighbourhood: about 36)
51 spill events counted
Southern Water Eden Vale Wwtw into The Eden Vale Stream 18 spills, 153 hours in 2025
1.7 km away Southern Water Baldwins Hill Pumping Station into Trib Of The River Medway 25 spills, 129 hours in 2025
1.2 km away Southern Water Dallaway Gdns E Grinstead Cso into Unnamed Tributary Of R Medway 4 spills, 6 hours in 2025
1.2 km away Southern Water Charlwoods Road East Grinstead Cso into The Eden Vale Stream 3 spills, 2 hours in 2025
1.2 km away Southern Water Mount Noddy Cem. East Grinstead Cso into Unamed Trib Of Medway Via Pond 1 spills, 1 hours in 2025
1.6 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 6 planned, approved or being built and 3 running (6 MW between them). Those within 5 km are on the map above.
Rooftop solar Jubilee Community Centre, Charlwoods Road - Solar panels Approved, not yet built · 190 kW
Oct 2025 850 m away Solar farm Sewage Disposal Works, Eden Vale - Ground Mounted Solar Panels Approved, not yet built · 200 kW
Jun 2023 1.2 km away Solar farm Eden Vale Farm, Eden Vale Dormans Park - Solar Photovoltaic Array Planning application in · 200 kW
May 2023 1.3 km away Rooftop solar The Mcindoe Centre, Holtye Road - Solar Panels Approved, not yet built · 290 kW
Apr 2024 1.6 km away Solar farm Haxted Mead, Lingfield - Solar Farm Planning application in · 50 MW
Jul 2025 7.3 km away Solar farm Gatwick House, Pound Hill - Solar Panels Planning application in · 160 kW
Jul 2023 8.1 km away Running nearest: Worsted Farm (solar farm, 3.1 km); Majors Hill/Turners Hill Solar Farm (solar farm, 6.3 km); Oriel High School (rooftop solar, 9.7 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km 3 permitted works running now or planned, 3 of them major.
Major Heathcote Drive, East Grinstead New service connection · Leep Utilities Electric · Some carriageway incursion
Jul 2026 to Nov 2026 300 m away Major Garland Road, East Grinstead New service connection · Leep Utilities Electric · Road closure
Oct 2026 to Nov 2026 750 m away Major London Road, East Grinstead New service connection · Leep Utilities Electric · Multi-way signals
Nov 2026 to Dec 2026 800 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Sept 2025 11.2 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.