Country England and Wales › Region South East › Council Reigate and Banstead › Neighbourhood Redhill East › Postcode RH1 6DD What's changing near RH1 6DD Within 2 km, around Redhill East in Reigate and Banstead. Building, planning, schools, transport, prices and crime.
109 new homes completed within 2 km, last 2 years
309 homes given permission on brownfield sites since 2021
+2.3% like-for-like prices in Redhill East, 2024 → 2025 (council +1.1%)
+18% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 17 new homes completed 16 flats, 1 houses · Mar 2025 – Sep 2026
Sept 2026 1.3 km away New homes 29 new homes completed flats · Jan 2026 – Mar 2026
Mar 2026 800 m away Planning permission Dec 2025 700 m away New homes 8 new homes completed houses · Mar 2025 – Jun 2025
Jun 2025 1.3 km away New homes 8 new homes completed flats · Apr 2025
Apr 2025 1.5 km away Planning permission Mar 2025 400 m away New homes 18 new homes completed flats · Feb 2025
Feb 2025 950 m away Planning permission Jan 2025 1.9 km away Planning permission Oct 2024 900 m away 30 homes extended 2021–2025, typically adding 34 m²
60 since energy certificates began (2008)
2 in RH1 6DD itself
Extended certificate 2017 Extended certificate 2013 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
3 hours of spills in 2025 between them (typical neighbourhood: about 36)
3 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 17 planned, approved or being built and 2 running (5 MW between them). Those within 5 km are on the map above.
Rooftop solar East Surrey Hospital, Canada Avenue -Solar Panels Approved, not yet built · 2 MW
Nov 2025 2.1 km away Battery storage Woodhatch Place, Cockshot Hill - Micro Energy Storage System Approved, not yet built · 200 kW
Oct 2024 2.2 km away Rooftop solar The Royal Alexandra And Albert School, Gatton Park - Solar PV Panels Approved, not yet built · 340 kW
May 2023 2.8 km away Battery storage Merstham Community Hub, Merstham - Energy Storage Facility Planning application in · 200 kW
Jul 2024 3.3 km away Solar farm Little Flanchford Farm, Flanchford Road - Solar Energy Planning application in · 20 MW
Nov 2024 5.1 km away Solar farm Duxhurst Farm, Duxhurst Lane - Solar Farm Approved, not yet built
Dec 2023 5.6 km away Battery storage Duxhurst Farm, Duxhurst Lane - Solar Farm Approved, not yet built
Dec 2023 5.6 km away Hydro Betchworth Weir Approved, not yet built · 200 kW
Jul 2019 6.4 km away Rooftop solar Legal And General Kingswood House, St Monicas Road - Solar Panels Approved, not yet built
May 2023 7.2 km away Battery storage South Terminal Car Park Forecourt - Electric Vehicle Charging Forecourt Being built
Sept 2022 7.4 km away Road and street works within 1 km 2 permitted works running now or planned, 1 of them major.
Major, planned Townpath From Redstone Hill To Marketfield Way, Redhill Works for Rail Purposes · NETWORK RAIL · No carriageway incursion
Dec 2026 to Dec 2026 600 m away Minor Brooklands Way, Redhill Highway repair and maintenance works · SURREY COUNTY COUNCIL · Give and take
Oct 2026 to Oct 2026 950 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Sept 2025 9.2 km away Decided decided May 2022 21.4 km away Pre-application application due March 2027 27.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Patteson Court Landfill Site (landfill gas, 1.9 km); Redhill 2 (landfill gas, 2.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.