Country England and Wales › Region South East › Council Tandridge › Neighbourhood Nutfield & Bletchingley › Postcode RH1 4JL What's changing near RH1 4JL Within 2 km, around Nutfield & Bletchingley in Tandridge. Building, planning, schools, transport, prices and crime.
7 new homes completed within 2 km, last 2 years
13 homes given permission on brownfield sites since 2021
+2.6% like-for-like prices in Nutfield & Bletchingley, 2024 → 2025 (council +2.3%)
+22% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 1 postcodes nearby had new homes completed in the last two years.
6 homes extended 2021–2025, typically adding 29 m²
14 since energy certificates began (2008)
3 in RH1 4JL itself
Extended certificate 2023 Extended certificate 2021 Extended certificate 2018 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 16 planned, approved or being built and 2 running (5 MW between them). Those within 5 km are on the map above.
Rooftop solar East Surrey Hospital, Canada Avenue -Solar Panels Approved, not yet built · 2 MW
Nov 2025 2.3 km away Battery storage Merstham Community Hub, Merstham - Energy Storage Facility Planning application in · 200 kW
Jul 2024 3.6 km away Battery storage Woodhatch Place, Cockshot Hill - Micro Energy Storage System Approved, not yet built · 200 kW
Oct 2024 4.7 km away Rooftop solar The Royal Alexandra And Albert School, Gatton Park - Solar PV Panels Approved, not yet built · 340 kW
May 2023 4.7 km away Battery storage Godstone Fire Station, Fosterdown - Micro Energy Storage Facility Approved, not yet built · 200 kW
Oct 2024 5.4 km away Solar farm Duxhurst Farm, Duxhurst Lane - Solar Farm Approved, not yet built
Dec 2023 6.6 km away Battery storage Duxhurst Farm, Duxhurst Lane - Solar Farm Approved, not yet built
Dec 2023 6.6 km away Battery storage South Terminal Car Park Forecourt - Electric Vehicle Charging Forecourt Being built
Sept 2022 6.8 km away Solar farm Little Flanchford Farm, Flanchford Road - Solar Energy Planning application in · 20 MW
Nov 2024 7.7 km away Rooftop solar Tesco Extra, Reigate Road - Solar Panels Approved, not yet built · 380 kW
Mar 2026 7.7 km away Road and street works within 1 km 4 permitted works running now or planned, 4 of them major.
Major Braes Mead, South Nutfield Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Jun 2026 to Oct 2026 300 m away Major Bower Hill Lane, South Nutfield Works for Rail Purposes · NETWORK RAIL · Road closure
Oct 2026 to Oct 2026 600 m away Major Kings Cross Lane, South Nutfield Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Sept 2026 to Oct 2026 800 m away Major Kings Mill Lane, South Nutfield Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Jan 2027 to Mar 2027 900 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Sept 2025 9.1 km away Decided decided May 2022 24.4 km away Pre-application application due March 2027 29.6 km away Pre-application application due March 2028 30.0 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Redhill 2 (landfill gas, 1.2 km); Patteson Court Landfill Site (landfill gas, 2.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.