Country England and Wales › Region South East › Council Horsham › Neighbourhood Horsham East & Roffey › Postcode RH13 5SG What's changing near RH13 5SG Within 2 km, around Horsham East & Roffey in Horsham. Building, planning, schools, transport, prices and crime.
49 new homes completed within 2 km, last 2 years
195 homes given permission on brownfield sites since 2021
+5.5% like-for-like prices in Horsham East & Roffey, 2024 → 2025 (council +1.9%)
-8% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 20 new homes completed flats · Oct 2025
Oct 2025 1.4 km away School closed School closed: Littlehaven Educational Trust Miscellaneous, miscellaneous (closure)
Sept 2025 750 m away New homes 5 new homes completed flats · Apr 2025
Apr 2025 650 m away New homes 15 new homes completed flats · Feb 2025
Feb 2025 550 m away Planning permission Jul 2024 600 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
27 homes extended 2021–2025, typically adding 27 m²
61 since energy certificates began (2008)
1 in RH13 5SG itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
49 hours of spills in 2025 between them (typical neighbourhood: about 36)
7 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 11 planned, approved or being built and 8 running (25 MW between them). Those within 5 km are on the map above.
Rooftop solar Sainsburys Supermarket, Worthing Road - Solar Panels Approved, not yet built · 650 kW
May 2026 1.1 km away Rooftop solar Skylark House, St Marks Lane - Solar Panels Approved, not yet built · 150 kW
Oct 2023 2.3 km away Energy from waste Britania Crest Recycling Limited - 3RS EfW Facilty Approved, not yet built · 21 MW
Feb 2020 3.9 km away Rooftop solar Fisher Clinical Services - Solar Panels Planning application in · 900 kW
May 2026 4.2 km away Solar farm Broadlands Business Campus, Langhurst Wood Road - Solar Panels Phase 3 Approved, not yet built · 480 kW
May 2023 5.1 km away Solar farm Broadlands Business Campus, Langhurst Wood Road - Solar Panels Phase 2 Approved, not yet built
May 2023 5.1 km away Battery storage Great Oak Energy Hub Approved, not yet built · 400 MW
Mar 2025 6.6 km away Solar farm Cobwood Solar Farm, Burnthouse Lane - Solar Farm & Battery Storage Approved, not yet built · 50 MW
May 2024 7.8 km away Battery storage Cobwood Solar Farm, Burnthouse Lane - Solar Farm & Battery Storage Approved, not yet built
May 2024 7.8 km away Solar farm Smoke Jacks Brickworks, Horsham Road - Ground Mounted Solar Panels Planning application in · 2 MW
Dec 2024 9.3 km away Road and street works within 1 km 11 permitted works running now or planned, 3 of them major.
Major Kennedy Road, Horsham Optional permit (no fee) e.g. for traffic management etc · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Apr 2026 to Nov 2026 500 m away Major Macleod Road, Horsham Optional permit (no fee) e.g. for traffic management etc · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Jun 2026 to Nov 2026 600 m away Major Denne Road, Horsham Utility asset works · BT · Road closure
Oct 2026 to Oct 2026 900 m away Standard West Street, Horsham New service connection · UK POWER NETWORKS SOUTH EASTERN · Some carriageway incursion
Jan 2027 to Jan 2027 900 m away Standard Causeway, Horsham Section 50 · WEST SUSSEX COUNTY COUNCIL · No carriageway incursion
Oct 2026 to Nov 2026 900 m away Minor New Street, Horsham New service connection · BT · No carriageway incursion
Nov 2026 to Nov 2026 400 m away Minor North Street, Horsham Highway improvement works · WEST SUSSEX COUNTY COUNCIL · No carriageway incursion
Oct 2026 to Oct 2026 500 m away Minor Harwood Road, Horsham Highway repair and maintenance works · WEST SUSSEX COUNTY COUNCIL · Stop/go boards
Jan 2027 to Jan 2027 700 m away Minor Kings Road, Horsham Highway repair and maintenance works · WEST SUSSEX COUNTY COUNCIL · Two-way signals
Jan 2027 to Jan 2027 750 m away Minor Major infrastructure projects within 30 km Decided decided Sept 2025 13.8 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: St Peters Hall (rooftop solar, 1.8 km); Broockhurst Wood (landfill gas, 3.9 km); Land at Christ’s Hospital School (solar farm, 4.5 km); Brookhurst Wood Gas to Energy (landfill gas, 4.5 km); Brookhurst Wood (Waste AD) (anaerobic digestion, 4.6 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.