Country England and Wales › Region South East › Council Horsham › Neighbourhood Horsham Central › Postcode RH12 2EW What's changing near RH12 2EW Within 2 km, around Horsham Central in Horsham. Building, planning, schools, transport, prices and crime.
50 new homes completed within 2 km, last 2 years
195 homes given permission on brownfield sites since 2021
+3.0% like-for-like prices in Horsham Central, 2024 → 2025 (council +1.9%)
+4% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School closed Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 20 new homes completed flats · Oct 2025
Oct 2025 600 m away School closed School closed: Littlehaven Educational Trust Miscellaneous, miscellaneous (closure)
Sept 2025 1.6 km away New homes 5 new homes completed flats · Apr 2025
Apr 2025 1.5 km away New homes 15 new homes completed flats · Feb 2025
Feb 2025 850 m away Planning permission Jul 2024 700 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 9 postcodes nearby had new homes completed in the last two years.
7 homes extended 2021–2025, typically adding 37 m²
18 since energy certificates began (2008)
5 in RH12 2EW itself
Extended certificate 2026 Extended certificate 2019 Extended certificate 2019 Extended certificate 2019 Extended certificate 2018 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 2 storm overflows within 2 km
74 hours of spills in 2025 between them (typical neighbourhood: about 36)
19 spill events counted
Southern Water Kerves Lane Horsham Wps into Horn Brook 7 spills, 49 hours in 2025
2.0 km away Southern Water Farhalls Crescent Horsham Cso into Freshwater River 12 spills, 25 hours in 2025
1.8 km away Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 11 planned, approved or being built and 8 running (25 MW between them). Those within 5 km are on the map above.
Rooftop solar Sainsburys Supermarket, Worthing Road - Solar Panels Approved, not yet built · 650 kW
May 2026 1.0 km away Rooftop solar Skylark House, St Marks Lane - Solar Panels Approved, not yet built · 150 kW
Oct 2023 1.6 km away Energy from waste Britania Crest Recycling Limited - 3RS EfW Facilty Approved, not yet built · 21 MW
Feb 2020 3.1 km away Rooftop solar Fisher Clinical Services - Solar Panels Planning application in · 900 kW
May 2026 3.4 km away Solar farm Broadlands Business Campus, Langhurst Wood Road - Solar Panels Phase 3 Approved, not yet built · 480 kW
May 2023 4.3 km away Solar farm Broadlands Business Campus, Langhurst Wood Road - Solar Panels Phase 2 Approved, not yet built
May 2023 4.3 km away Battery storage Great Oak Energy Hub Approved, not yet built · 400 MW
Mar 2025 7.1 km away Solar farm Cobwood Solar Farm, Burnthouse Lane - Solar Farm & Battery Storage Approved, not yet built · 50 MW
May 2024 8.6 km away Battery storage Cobwood Solar Farm, Burnthouse Lane - Solar Farm & Battery Storage Approved, not yet built
May 2024 8.6 km away Solar farm Smoke Jacks Brickworks, Horsham Road - Ground Mounted Solar Panels Planning application in · 2 MW
Dec 2024 8.6 km away Road and street works within 1 km 18 permitted works running now or planned, 7 of them major.
Major, planned Allcard Close, Horsham Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Oct 2026 to Oct 2026 700 m away Major Allcard Close, Horsham Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Oct 2026 to Oct 2026 700 m away Major, planned North Heath Lane, Horsham Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Oct 2026 to Oct 2026 700 m away Major North Heath Lane, Horsham Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Oct 2026 to Oct 2026 700 m away Major Blenheim Road, Horsham Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Oct 2026 to Nov 2026 750 m away Major Ramsey Close, Horsham Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Multi-way signals
Oct 2026 to Nov 2026 750 m away Major, planned Heather Close, Horsham Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Oct 2026 to Oct 2026 850 m away Standard West Street, Horsham New service connection · UK POWER NETWORKS SOUTH EASTERN · Some carriageway incursion
Jan 2027 to Jan 2027 950 m away Minor North Street, Horsham Highway improvement works · WEST SUSSEX COUNTY COUNCIL · No carriageway incursion
Major infrastructure projects within 30 km Decided decided Sept 2025 13.5 km away Decided decided May 2022 29.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: St Peters Hall (rooftop solar, 1.8 km); Broockhurst Wood (landfill gas, 3.1 km); Brookhurst Wood Gas to Energy (landfill gas, 3.7 km); Brookhurst Wood (Waste AD) (anaerobic digestion, 3.8 km); Land at Christ’s Hospital School (solar farm, 4.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.