Country England and Wales › Region South East › Council Crawley › Neighbourhood Bewbush › Postcode RH11 8XW What's changing near RH11 8XW Within 2 km, around Bewbush in Crawley. Building, planning, schools, transport, prices and crime.
0 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+4.7% like-for-like prices in Bewbush, 2024 → 2025 (council +4.4%)
-6% recorded crime, last 12 months vs the 12 before
On the map
School opened Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New school Aug 2020 2.0 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 0 postcodes nearby had new homes completed in the last two years.
5 homes extended 2021–2025, typically adding 20 m²
12 since energy certificates began (2008)
0 in RH11 8XW itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
23 hours of spills in 2025 between them (typical neighbourhood: about 36)
5 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 20 planned, approved or being built and 7 running (16 MW between them). Those within 5 km are on the map above.
Rooftop solar K2 Crawley Leisure Centre, Pease Pottage Hill - Solar Panels Approved, not yet built · 420 kW
Nov 2024 2.3 km away Rooftop solar Unit 2, Hollywood Bowl, Crawley Leisure Park - Solar Array Approved, not yet built · 220 kW
May 2022 2.9 km away Rooftop solar Diva Innovation Centre, Crompton Way - Solar Panels Approved, not yet built
Aug 2025 3.9 km away Rooftop solar Yodel, County Oak Way - Solar Panels Approved, not yet built · 220 kW
Aug 2024 4.1 km away Rooftop solar Boeing House, Crawley Business Quarter - Solar Panels Approved, not yet built
Jun 2024 4.2 km away Rooftop solar Elekta Limited, Fleming Way - Solar Panels Approved, not yet built · 350 kW
Nov 2025 4.3 km away Rooftop solar Johnsons Hotel, Woolborough Lane -Solar Panels Approved, not yet built · 440 kW
Nov 2025 4.4 km away Rooftop solar Vodafone UK, Newton Road - Solar Panels Approved, not yet built · 270 kW
Jan 2023 4.5 km away Rooftop solar Welland Medical, Hydehurst Lane - Solar Panels Approved, not yet built · 940 kW
Oct 2022 4.9 km away Rooftop solar Skylark House, St Marks Lane - Solar Panels Approved, not yet built · 150 kW
Oct 2023 6.8 km away Road and street works within 1 km 31 permitted works running now or planned, 21 of them major.
Major, planned Calvin Walk, Crawley Utility repair and maintenance works · CITYFIBRE METRO NETWORKS LTD · No carriageway incursion
Dec 2026 to Dec 2026 300 m away Major, planned Coxcomb Walk 50 To 42, Crawley Utility repair and maintenance works · CITYFIBRE METRO NETWORKS LTD · No carriageway incursion
Dec 2026 to Dec 2026 500 m away Major Tintern Road Side Of 44, Crawley Highway improvement works · WEST SUSSEX COUNTY COUNCIL · Give and take
Jul 2026 to Oct 2026 750 m away Major Tintern Road 12 To 20, Crawley Highway improvement works · WEST SUSSEX COUNTY COUNCIL · Give and take
Jul 2026 to Oct 2026 800 m away Major Tintern Road To Woburn Road, Crawley Highway improvement works · WEST SUSSEX COUNTY COUNCIL · Give and take
Jul 2026 to Oct 2026 800 m away Major Tintern Road To Fountains Close, Crawley Highway improvement works · WEST SUSSEX COUNTY COUNCIL · Give and take
Jul 2026 to Oct 2026 800 m away Major Tintern Road 30 To 24, Crawley Highway improvement works · WEST SUSSEX COUNTY COUNCIL · Give and take
Jul 2026 to Oct 2026 850 m away Major Fountains Close To Footpath, Crawley Highway improvement works · WEST SUSSEX COUNTY COUNCIL · Give and take
Jul 2026 to Oct 2026 850 m away Major Woburn Road Side Of 25, Crawley Highway improvement works · WEST SUSSEX COUNTY COUNCIL · Give and take
Jul 2026 to Oct 2026 850 m away Major infrastructure projects within 30 km Decided decided Sept 2025 6.2 km away Decided decided May 2022 29.0 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Oriel High School (rooftop solar, 4.5 km); Brookhurst Wood Gas to Energy (landfill gas, 7.3 km); Brookhurst Wood (Waste AD) (anaerobic digestion, 7.3 km); Majors Hill/Turners Hill Solar Farm (solar farm, 7.9 km); Capel Landfill (landfill gas, 8.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.