43 new homes completed within 2 km, last 2 years
493 homes given permission on brownfield sites since 2021
+7.2% like-for-like prices in Langley Green & Gatwick Airport, 2024 → 2025 (council +4.4%)
+5% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 3 postcodes nearby had new homes completed in the last two years.
14 homes extended 2021–2025, typically adding 23 m²
22 since energy certificates began (2008)
0 in RH11 7UD itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 17 planned, approved or being built and 5 running (12 MW between them). Those within 5 km are on the map above.
Rooftop solar Diva Innovation Centre, Crompton Way - Solar Panels Approved, not yet built
Aug 2025 500 m away Rooftop solar Boeing House, Crawley Business Quarter - Solar Panels Approved, not yet built
Jun 2024 650 m away Rooftop solar Yodel, County Oak Way - Solar Panels Approved, not yet built · 220 kW
Aug 2024 700 m away Rooftop solar Elekta Limited, Fleming Way - Solar Panels Approved, not yet built · 350 kW
Nov 2025 800 m away Rooftop solar Unit 2, Hollywood Bowl, Crawley Leisure Park - Solar Array Approved, not yet built · 220 kW
May 2022 900 m away Rooftop solar Vodafone UK, Newton Road - Solar Panels Approved, not yet built · 270 kW
Jan 2023 1.1 km away Rooftop solar Johnsons Hotel, Woolborough Lane -Solar Panels Approved, not yet built · 440 kW
Nov 2025 1.2 km away Rooftop solar Welland Medical, Hydehurst Lane - Solar Panels Approved, not yet built · 940 kW
Oct 2022 1.3 km away Rooftop solar K2 Crawley Leisure Centre, Pease Pottage Hill - Solar Panels Approved, not yet built · 420 kW
Nov 2024 3.4 km away Rooftop solar Tesco Extra, Reigate Road - Solar Panels Approved, not yet built · 380 kW
Mar 2026 4.5 km away Road and street works within 1 km 8 permitted works running now or planned, 7 of them major.
Major Five Acres, Crawley Highway repair and maintenance works · WEST SUSSEX COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026 500 m away Major Firle Close, Crawley Highway repair and maintenance works · WEST SUSSEX COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026 500 m away Major Bramber Close, Crawley Highway repair and maintenance works · WEST SUSSEX COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026 550 m away Major Black Dog Walk, Crawley Highway repair and maintenance works · WEST SUSSEX COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026 550 m away Major Steyning Close, Crawley Highway repair and maintenance works · WEST SUSSEX COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026 600 m away Major Oak Way, Crawley Highway repair and maintenance works · WEST SUSSEX COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026 650 m away Major Willow Close, Crawley Highway repair and maintenance works · WEST SUSSEX COUNTY COUNCIL · Road closure
Oct 2026 to Nov 2026 650 m away Minor Woodfield Road, Crawley Utility repair and maintenance works · SOUTHERN WATER · Some carriageway incursion
Oct 2026 to Oct 2026 950 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Sept 2025 2.9 km away Decided decided May 2022 28.2 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Oriel High School (rooftop solar, 3.3 km); Majors Hill/Turners Hill Solar Farm (solar farm, 6.0 km); Capel Landfill (landfill gas, 9.5 km); Brookhurst Wood Gas to Energy (landfill gas, 10.0 km); Brookhurst Wood (Waste AD) (anaerobic digestion, 10.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.