What's changing near RG9 2LH
Within 2 km, around Henley North in South Oxfordshire. Building, planning, schools, transport, prices and crime.
19new homes completed within 2 km, last 2 years
29homes given permission on brownfield sites since 2021
-4.4%like-for-like prices in Henley North, 2024 → 2025 (council +1.4%)
-1%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- Planning permissionAug 2021
900 m away - Planning permissionJul 2021
1.6 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 13 postcodes nearby had new homes completed in the last two years.
25homes extended 2021–2025, typically adding 30 m²
49since energy certificates began (2008)
0in RG9 2LH itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
10hours of spills in 2025 between them (typical neighbourhood: about 36)
4spill events counted
- Thames Water
Friday Street, Henleyinto Thames4 spills, 10 hours in 2025
450 m away - Thames Water
Henley Wastewater Treatment Worksinto Fawley Court Stream0 spills, 0 hours in 2025
1.1 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
7 planned, approved or being built and 1 running (2 MW between them). Those within 5 km are on the map above.
- Solar farm
Horizon, Hurley - Solar PanelsPlanning application in · 1 MW
Aug 2022
6.5 km away - Rooftop solar
Berkshire College Of Agriculture, Burchetts Green Road - Solar PanelsPlanning application in
May 2026
7.4 km away - Solar farm
St Lukes Residential Care Home, Marshland Square - Solar PanelsApproved, not yet built · 190 kW
Jul 2025
8.1 km away - Rooftop solar
David Lloyd Leisure, Thames Valley Park Drive - Solar PanelsApproved, not yet built
Jun 2023
9.1 km away - Rooftop solar
Thames Valley Park Drive, Earley - Photovoltaic Solar panelsApproved, not yet built · 160 kW
May 2022
9.3 km away - Rooftop solar
Suttons Park Avenue, Suttons Business Park - Solar PVApproved, not yet built · 1 MW
Aug 2023
9.7 km away - Rooftop solar
Woodley Library Solar PlanelsApproved, not yet built
Jun 2021
9.8 km away
Running nearest: High Heavens Landfill (landfill gas, 10.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Road and street works within 1 km
17 permitted works running now or planned, 7 of them major.
- Major
Badgemore Lane, Henley-On-ThamesHighway improvement works · OXFORDSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
50 m away - Major
Mount View, Henley-On-ThamesHighway improvement works · OXFORDSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
200 m away - Major
Mount View, Henley-On-ThamesHighway improvement works · OXFORDSHIRE COUNTY COUNCIL · Road closure
Oct 2026 to Oct 2026
250 m away - Major
Bell Street, Henley-On-ThamesNew service connection · THAMES WATER · Road closure
Oct 2026 to Oct 2026
300 m away - Major
Hart Street, Henley-On-ThamesNew service connection · THAMES WATER · Lane closure
Oct 2026 to Oct 2026
400 m away - Major
Remenham Lane, RemenhamStatutory Infrastructure Works · CITYFIBRE METRO NETWORKS LTD · Road closure
Oct 2026 to Oct 2026
700 m away - Major
Henley On Thames Footpath 18, Henley-On-ThamesUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Mar 2027 to Mar 2027
850 m away - Minor
Northfield End, Henley-On-ThamesUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
150 m away - Minor
Mount View, Henley-On-ThamesUtility asset works · THAMES WATER · Give and take
Nov 2026 to Nov 2026
250 m away
Major infrastructure projects within 30 km
- Decideddecided Sept 2016
12.2 km away - Decideddecided Nov 2023
19.3 km away - Pre-application
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste). application due January 2027
22.1 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km