What's changing near RG40 5PJ
Within 2 km, around Wokingham East in Wokingham. Building, planning, schools, transport, prices and crime.
99new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+3.2%like-for-like prices in Wokingham East, 2024 → 2025 (council +2.1%)
-31%recorded crime, last 12 months vs the 12 before
On the map
New homesSchool openedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
21 new homes completedhouses · Dec 2025 – Oct 2026
Oct 2026
1.1 km away - New homes
10 new homes completedhouses · Jun 2026 – Sep 2026
Sept 2026
1.6 km away - New homes
5 new homes completedhouses · May 2026 – Jun 2026
Jun 2026
1.0 km away - New homes
27 new homes completedflats · Jul 2025
Jul 2025
1.4 km away - New homes
21 new homes completed6 flats, 15 houses · Oct 2024
Nov 2024
1.5 km away - New school
New school: Odyssey House School - WokinghamOther independent special school, other independent special school
Sept 2023
1.3 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 13 postcodes nearby had new homes completed in the last two years.
15homes extended 2021–2025, typically adding 32 m²
25since energy certificates began (2008)
1in RG40 5PJ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
2storm overflows within 2 km
153hours of spills in 2025 between them (typical neighbourhood: about 36)
18spill events counted
- Thames Water
Wokingham (Ash Ridge)into Ashridge Stream11 spills, 136 hours in 2025
1.5 km away - Thames Water
Waterloo Crescent Outfallinto Waterloo Road Stream7 spills, 18 hours in 2025
1.4 km away
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
20 planned, approved or being built and 0 running. Those within 5 km are on the map above.
- Rooftop solar
Rectory Road - Roof Mounted Solar panelsApproved, not yet built
Apr 2021
1.6 km away - Solar farm
John Nike Way, Binfield - Solar PanelsPlanning application in · 770 kW
Feb 2026
1.7 km away - Solar farm
Billingbear Solar FarmApproved, not yet built · 22 MW
Jul 2024
4.7 km away - Hydrogen
Billingbear Solar Farm - HydrogenApproved, not yet built
Jul 2024
4.7 km away - Solar farm
Barkham Farms - Solar FarmApproved, not yet built · 33 MW
Jan 2022
5.2 km away - Rooftop solar
Eskdale Road, Winnersh - Solar PanelsApproved, not yet built · 190 kW
Sept 2022
5.2 km away - Rooftop solar
The Paddock Centre, Joshua Jebb Way - Solar PanelsApproved, not yet built · 190 kW
Jan 2025
5.8 km away - Rooftop solar
David Lloyd Royal Berkshire - Solar PanelsApproved, not yet built
Sept 2025
5.8 km away - Rooftop solar
Broadmoor Hospital, Lower Broadmoor Road - Solar Photovoltaic PanelsApproved, not yet built · 430 kW
Feb 2026
5.8 km away - Rooftop solar
Edgbarrow School, Grant Road - Solar PanelsApproved, not yet built · 200 kW
Jun 2026
6.2 km away - Rooftop solar
Woodley Library Solar Planels
Road and street works within 1 km
No road or street works with a permit running now or planned within 1 km (England; permits granted up to the end of September 2026).
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Sept 2016
8.9 km away - Decideddecided Nov 2023
17.5 km away - Pre-application
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste). application due January 2027
24.2 km away - Pre-application
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport application due November 2027
24.7 km away - Pre-applicationapplication due December 2027
25.7 km away - Decided
Transport schemes within 20 km
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.