Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Heathrow WestAirports · Heathrow Airport and land to the north-west and west of Heathrow Airport
application due November 2027 29.5 km away
Pre-application
SDC M40 CampusGenerating Stations · The site of the project is located in Buckinghamshire, England. It is approximately 2km to the west of Gerrards Cross, approximately 2.5km east of Beaconsfield and approximately 1.5km north of Hedgerley. The site comprises land immediately to the south of the A40 Oxford Road and immediately to the north of the M40 motorway. It has a history of landfill activities and is currently operated by Veolia for the landfilling of inert building waste (albeit the site no longer accepts any forms of waste).
17 new homes completedhouses · Oct 2024 – Jun 2025
Jun 2025 1.9 km away
New homes
19 new homes completedhouses · Oct 2024 – Jun 2025
Jun 2025 1.9 km away
New homes
7 new homes completedhouses · Dec 2024 – Apr 2025
Apr 2025 1.9 km away
New homes
17 new homes completedhouses · Jan 2025 – Mar 2025
Mar 2025 650 m away
New homes
5 new homes completedhouses · Nov 2024 – Feb 2025
Feb 2025 1.8 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 30 postcodes nearby had new homes completed in the last two years.
Spencers Wood Solar Farm, Basingstoke Road - Solar ArrayApproved, not yet built
Mar 2025 7.0 km away
Rooftop solar
Tesco Stores, Marshall Road - Solar PanelsApproved, not yet built · 210 kW
Dec 2025 8.0 km away
Running nearest: Sheepbridge Court Farm (solar farm, 6.7 km); Green Park (wind farm, 9.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.
Highways · M25 Junction 10, near Wisley, Surrey and A3 between Cobham/Byfleet and Ripley/Ockham.
decided May 2022 29.6 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.