What's changing near RG2 8SY
Within 2 km, around Shinfield in Wokingham. Building, planning, schools, transport, prices and crime.
40new homes completed within 2 km, last 2 years
49homes given permission on brownfield sites since 2021
+0.5%like-for-like prices in Shinfield, 2024 → 2025 (council +2.1%)
-13%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedSchool openedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- New homes
6 new homes completedhouses · Apr 2026
Apr 2026
700 m away - New homes
12 new homes completedhouses · Dec 2024 – Jul 2025
Jul 2025
1.7 km away - New homes
5 new homes completedhouses · Nov 2024
Dec 2024
1.7 km away - New homes
6 new homes completedhouses · Oct 2024 – Nov 2024
Nov 2024
1.6 km away - Planning permissionApr 2021
1.5 km away - Planning permissionApr 2021
1.5 km away - New schoolSept 2020
1.4 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
13homes extended 2021–2025, typically adding 38 m²
26since energy certificates began (2008)
1in RG2 8SY itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
34 planned, approved or being built and 4 running (25 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Relief Road - Solar Photovoltaic PanelsApproved, not yet built · 600 kW
Feb 2022
1.3 km away - Rooftop solar
Reading International Business Park, Relief Road - Solar PanelsApproved, not yet built · 190 kW
May 2023
1.3 km away - Rooftop solar
Reading International Business Park - Roof Mounted Solar PanelsApproved, not yet built · 260 kW
Dec 2021
1.3 km away - Solar farm
Reading International Business Park - Car Port & Solar PanelsApproved, not yet built
Jan 2024
1.3 km away - Solar farm
Mereoak Park And Ride, Mereoak Lane - Solar CanopiesApproved, not yet built
Nov 2025
1.6 km away - Rooftop solar
Arena Business Park, Acre Road- Photovoltaics Solar PanelsApproved, not yet built · 320 kW
Apr 2023
1.6 km away - Rooftop solar
Voco Reading Hotel, Shooters Way - Solar PanelsApproved, not yet built · 370 kW
Mar 2024
1.9 km away - Rooftop solar
Starline Holdings Technology, Island Road - Solar PanelsApproved, not yet built · 510 kW
Mar 2024
2.7 km away - Rooftop solar
Big Yellow Self Storage Building, Rose Kiln Lane - Solar PV PanelsPlanning application in · 170 kW
Jul 2024
3.1 km away - Solar farm
Spencers Wood Solar Farm, Basingstoke Road - Solar ArrayApproved, not yet built · 28 MW
Road and street works within 1 km
12 permitted works running now or planned.
- Standard
Whitley Wood Road, ReadingNew service connection · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Oct 2026 to Oct 2026
250 m away - Minor
Railton Close, ShinfieldUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
100 m away - Minor
Whitley Wood Road, ReadingUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
250 m away - Minor
Whitley Wood Road, ReadingUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
400 m away - Minor
Burlingham Close, ReadingUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
450 m away - Minor
Greenfields Road, ReadingUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Nov 2026 to Nov 2026
700 m away - Minor
Greenfields Road, ReadingUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
750 m away - Minor
Thornbridge Road, ReadingUtility asset works · THAMES WATER · Some carriageway incursion
Jan 2027 to Jan 2027
800 m away - Minor
Kingsley Close, ReadingUtility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026
900 m away
Major infrastructure projects within 30 km
- Decideddecided Sept 2016
16.2 km away - Decideddecided Nov 2023
25.7 km away - Decideddecided Oct 2020
27.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Running nearest: Green Park (wind farm, 2.0 km); Sheepbridge Court Farm (solar farm, 3.1 km); Pingewood Road South (solar farm, 3.9 km); Pierces Farm (solar farm, 4.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.