Country England and Wales › Region South East › Council Wokingham › Neighbourhood Shinfield › Postcode RG2 8SX What's changing near RG2 8SX Within 2 km, around Shinfield in Wokingham. Building, planning, schools, transport, prices and crime.
40 new homes completed within 2 km, last 2 years
49 homes given permission on brownfield sites since 2021
+0.5% like-for-like prices in Shinfield, 2024 → 2025 (council +2.1%)
-13% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 6 new homes completed houses · Apr 2026
Apr 2026 700 m away New homes 12 new homes completed houses · Dec 2024 – Jul 2025
Jul 2025 1.7 km away New homes 5 new homes completed houses · Nov 2024
Dec 2024 1.6 km away New homes 6 new homes completed houses · Oct 2024 – Nov 2024
Nov 2024 1.6 km away Planning permission Apr 2021 1.5 km away Planning permission Apr 2021 1.5 km away New school Sept 2020 1.4 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
15 homes extended 2021–2025, typically adding 24 m²
30 since energy certificates began (2008)
0 in RG2 8SX itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 34 planned, approved or being built and 4 running (25 MW between them). Those within 5 km are on the map above.
Rooftop solar Relief Road - Solar Photovoltaic Panels Approved, not yet built · 600 kW
Feb 2022 1.2 km away Rooftop solar Reading International Business Park, Relief Road - Solar Panels Approved, not yet built · 190 kW
May 2023 1.2 km away Rooftop solar Reading International Business Park - Roof Mounted Solar Panels Approved, not yet built · 260 kW
Dec 2021 1.3 km away Solar farm Reading International Business Park - Car Port & Solar Panels Approved, not yet built
Jan 2024 1.3 km away Solar farm Mereoak Park And Ride, Mereoak Lane - Solar Canopies Approved, not yet built
Nov 2025 1.5 km away Rooftop solar Arena Business Park, Acre Road- Photovoltaics Solar Panels Approved, not yet built · 320 kW
Apr 2023 1.6 km away Rooftop solar Voco Reading Hotel, Shooters Way - Solar Panels Approved, not yet built · 370 kW
Mar 2024 1.8 km away Rooftop solar Starline Holdings Technology, Island Road - Solar Panels Approved, not yet built · 510 kW
Mar 2024 2.6 km away Rooftop solar Big Yellow Self Storage Building, Rose Kiln Lane - Solar PV Panels Planning application in · 170 kW
Jul 2024 3.1 km away Solar farm Spencers Wood Solar Farm, Basingstoke Road - Solar Array Approved, not yet built · 28 MW
Road and street works within 1 km 13 permitted works running now or planned.
Standard Whitley Wood Road, Reading New service connection · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Oct 2026 to Oct 2026 200 m away Minor Railton Close, Shinfield Utility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026 100 m away Minor Whitley Wood Road, Reading Utility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026 200 m away Minor Whitley Wood Road, Reading Utility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026 350 m away Minor Burlingham Close, Reading Utility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026 400 m away Minor Greenfields Road, Reading Utility repair and maintenance works · THAMES WATER · Some carriageway incursion
Nov 2026 to Nov 2026 700 m away Minor Greenfields Road, Reading Utility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026 750 m away Minor Thornbridge Road, Reading Utility asset works · THAMES WATER · Some carriageway incursion
Jan 2027 to Jan 2027 800 m away Minor Kingsley Close, Reading Utility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026 850 m away Major infrastructure projects within 30 km Decided decided Sept 2016 16.2 km away Decided decided Nov 2023 25.7 km away Decided decided Oct 2020 27.7 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: Green Park (wind farm, 1.9 km); Sheepbridge Court Farm (solar farm, 3.1 km); Pingewood Road South (solar farm, 3.9 km); Pierces Farm (solar farm, 4.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.