Country England and Wales › Region South East › Council Hart › Neighbourhood Hartley Wintney & Heckfield › Postcode RG27 8WR What's changing near RG27 8WR Within 2 km, around Hartley Wintney & Heckfield in Hart. Building, planning, schools, transport, prices and crime.
6 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+0.8% like-for-like prices in Hartley Wintney & Heckfield, 2024 → 2025 (council +2.8%)
-3% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 2 postcodes nearby had new homes completed in the last two years.
7 homes extended 2021–2025, typically adding 39 m²
9 since energy certificates began (2008)
0 in RG27 8WR itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 15 planned, approved or being built and 5 running (22 MW between them). Those within 5 km are on the map above.
Solar farm Holt Lane Solar Park Planning application in · 22 MW
May 2025 2.8 km away Solar farm Bunkers Hill Farm - Solar farm & Battery stations Being built · 50 MW
May 2023 3.4 km away Battery storage Bunkers Hill Farm - Solar farm & Battery stations Being built
May 2023 3.4 km away Rooftop solar Bartley Wood Business Park - Solar panels Approved, not yet built · 150 kW
Jul 2023 3.5 km away Battery storage Coxmoor Wood, Crondall Road - Battery Storage Approved, not yet built · 57 MW
Apr 2024 4.7 km away Solar farm Kiln Fields Solar Farm Being built · 18 MW
Jul 2023 5.3 km away Battery storage Blue Bell Lodge, Rye Common Lane - Battery Storage Approved, not yet built · 50 MW
May 2023 5.5 km away Battery storage Rye Common Approved, not yet built · 50 MW
Sept 2021 5.6 km away Battery storage Crondall Road, Crondall - Fleet Bramley Battery Energy Storage Approved, not yet built · 100 MW
Aug 2025 6.0 km away Solar farm Chosley Farm, North Warnborough Solar Farm and Battery storage Approved, not yet built · 50 MW
Nov 2021 6.4 km away Battery storage
Road and street works within 1 km 4 permitted works running now or planned, 2 of them major.
Major Dilly Lane, Hook Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Sept 2026 to Oct 2026 500 m away Major Minley Road, Camberley Optional permit (no fee) e.g. for traffic management etc · NATIONAL HIGHWAYS · No carriageway incursion
Jan 2027 to Feb 2027 800 m away Minor Green Lane, Hook Highway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026 850 m away Minor Odiham Road, Winchfield Highway repair and maintenance works · NATIONAL HIGHWAYS · Two-way signals
Nov 2026 to Nov 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2020 14.1 km away Decided decided Sept 2016 24.0 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: Taplins Farm solar park (solar farm, 1.8 km); Hungerford Farm (solar farm, 2.5 km); Basingstoke Sewage Treatment Works (anaerobic digestion, 8.8 km); Chineham ERF (energy from waste, 9.1 km); Farnborough Airport - Solar Panels (rooftop solar, 9.2 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.