What's changing near RG27 8TZ
Within 2 km, around Hartley Wintney & Heckfield in Hart. Building, planning, schools, transport, prices and crime.
8new homes completed within 2 km, last 2 years
0homes given permission on brownfield sites since 2021
+0.8%like-for-like prices in Hartley Wintney & Heckfield, 2024 → 2025 (council +2.8%)
-3%recorded crime, last 12 months vs the 12 before
On the map
New homesExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
5homes extended 2021–2025, typically adding 34 m²
13since energy certificates began (2008)
0in RG27 8TZ itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
300hours of spills in 2025 between them (typical neighbourhood: about 36)
21spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
20 planned, approved or being built and 5 running (22 MW between them). Those within 5 km are on the map above.
- Solar farm
Holt Lane Solar ParkPlanning application in · 22 MW
May 2025
3.2 km away - Solar farm
Bunkers Hill Farm - Solar farm & Battery stationsBeing built · 50 MW
May 2023
3.4 km away - Battery storage
Bunkers Hill Farm - Solar farm & Battery stationsBeing built
May 2023
3.4 km away - Rooftop solar
Bartley Wood Business Park - Solar panelsApproved, not yet built · 150 kW
Jul 2023
4.0 km away - Solar farm
Kiln Fields Solar FarmBeing built · 18 MW
Jul 2023
4.7 km away - Battery storage
Coxmoor Wood, Crondall Road - Battery StorageApproved, not yet built · 57 MW
Apr 2024
5.4 km away - Battery storage
Blue Bell Lodge, Rye Common Lane - Battery StorageApproved, not yet built · 50 MW
May 2023
6.2 km away - Battery storage
Rye CommonApproved, not yet built · 50 MW
Sept 2021
6.4 km away - Battery storage
Crondall Road, Crondall - Fleet Bramley Battery Energy StorageApproved, not yet built · 100 MW
Aug 2025
6.8 km away - Solar farm
Chosley Farm, North Warnborough Solar Farm and Battery storageApproved, not yet built · 50 MW
Nov 2021
7.1 km away - Battery storage
Road and street works within 1 km
4 permitted works running now or planned, 2 of them major.
- Major
Dilly Lane, HookUtility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Road closure
Sept 2026 to Oct 2026
550 m away - Major
Minley Road, CamberleyOptional permit (no fee) e.g. for traffic management etc · NATIONAL HIGHWAYS · No carriageway incursion
Jan 2027 to Feb 2027
850 m away - Minor
Green Lane, HookHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026
250 m away - Minor
Hartford Road, HookUtility repair and maintenance works · SOUTH EAST WATER · Some carriageway incursion
Oct 2026 to Oct 2026
900 m away
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km
- Decideddecided Oct 2020
15.0 km away - Decideddecided Sept 2016
23.2 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Running nearest: Taplins Farm solar park (solar farm, 2.2 km); Hungerford Farm (solar farm, 3.1 km); Basingstoke Sewage Treatment Works (anaerobic digestion, 8.9 km); Chineham ERF (energy from waste, 9.1 km); Farnborough Airport - Solar Panels (rooftop solar, 9.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.