Looking around…
These only choose where you start. Every page and every lens is still one tap away.
Sign in to keep them on every device →Looking around…
Within 2 km, around Kingsclere & Heath End in Basingstoke and Deane. Building, planning, schools, transport, prices and crime.
New homesPlanning grantedExtended homeEnergy projectBlack pin: the postcode. Tap a dot for details.
New-home postcodes with fewer than 5 homes are counted above but not listed. 2 postcodes nearby had new homes completed in the last two years.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
21 planned, approved or being built and 7 running (115 MW between them). Those within 5 km are on the map above.
2 permitted works running now or planned.
DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Running nearest: Gravel Works, Wasing Estate (solar farm, 3.1 km); Berry Court Farm (solar farm, 5.1 km); Limberlost Farm (solar farm, 5.2 km); Limberlost Solar Farm (battery storage, 5.2 km); Berry Court Solar Farm - energy storage (battery storage, 5.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.