Country England and Wales › Region South East › Council Basingstoke and Deane › Neighbourhood Tadley West › Postcode RG26 5NH What's changing near RG26 5NH Within 2 km, around Tadley West in Basingstoke and Deane. Building, planning, schools, transport, prices and crime.
3 new homes completed within 2 km, last 2 years
47 homes given permission on brownfield sites since 2021
+4.2% like-for-like prices in Tadley West, 2024 → 2025 (council +3.4%)
-19% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first Planning permission Jun 2021 1.6 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 3 postcodes nearby had new homes completed in the last two years.
6 homes extended 2021–2025, typically adding 32 m²
14 since energy certificates began (2008)
2 in RG26 5NH itself
Extended certificate 2015 Extended certificate 2013 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
5 hours of spills in 2025 between them (typical neighbourhood: about 36)
1 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 21 planned, approved or being built and 7 running (115 MW between them). Those within 5 km are on the map above.
Rooftop solar Sainsburys, Mulfords Hill - Solar Panels Approved, not yet built · 410 kW
Oct 2025 1.5 km away Solar farm Exolum, Silver Lane - Solar PV Array Approved, not yet built · 2 MW
Jun 2026 5.3 km away Rooftop solar Padworth Iwmf, Padworth Lane - Solar Panels Approved, not yet built · 900 kW
May 2026 5.4 km away Battery storage Ash Lane, Little London - Battery Storage Approved, not yet built · 57 MW
Feb 2023 5.6 km away Battery storage Ash Lane, Little London - Battery Storage Facility Approved, not yet built
Apr 2025 5.9 km away Rooftop solar Harrods Distribution Centre, Mill Lane - Solar Array Approved, not yet built · 2 MW
Feb 2023 6.4 km away Battery storage Withy Place, Bramley Road - Battery Energy Storage Approved, not yet built · 50 MW
Jul 2025 6.5 km away Solar farm Bath Road, Grange Lane - Solar Photovoltaic Array Approved, not yet built · 12 MW
Mar 2025 6.5 km away Battery storage Bath Road, Grange Lane - Battery Storage Approved, not yet built
Mar 2025 6.5 km away Solar farm Bramley Frith Solar Farm Approved, not yet built · 50 MW
Feb 2023 6.8 km away Battery storage Road and street works within 1 km 5 permitted works running now or planned.
Standard Newchurch Road, Tadley Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026 900 m away Minor Bishopswood Road, Tadley Utility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Nov 2026 550 m away Minor Franklin Avenue, Tadley Utility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026 600 m away Minor Priors Road, Tadley Utility asset works · THAMES WATER · No carriageway incursion
Nov 2026 to Nov 2026 650 m away Minor Whitedown Road Footpath, Tadley Utility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026 650 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2020 26.3 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: Gravel Works, Wasing Estate (solar farm, 3.3 km); Berry Court Farm (solar farm, 4.8 km); Berry Court Solar Farm - energy storage (battery storage, 5.1 km); Limberlost Farm (solar farm, 5.5 km); Limberlost Solar Farm (battery storage, 5.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.