Country England and Wales › Region South East › Council Basingstoke and Deane › Neighbourhood Bramley, Sherfield & the Sherbornes › Postcode RG26 5AQ What's changing near RG26 5AQ Within 2 km, around Bramley, Sherfield & the Sherbornes in Basingstoke and Deane. Building, planning, schools, transport, prices and crime.
23 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+2.4% like-for-like prices in Bramley, Sherfield & the Sherbornes, 2024 → 2025 (council +3.4%)
+10% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New-home postcodes with fewer than 5 homes are counted above but not listed. 7 postcodes nearby had new homes completed in the last two years.
22 homes extended 2021–2025, typically adding 34 m²
33 since energy certificates began (2008)
4 in RG26 5AQ itself
Extended certificate 2024 Extended certificate 2020 Extended certificate 2018 Extended certificate 2016 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 30 planned, approved or being built and 8 running (124 MW between them). Those within 5 km are on the map above.
Solar farm Bramley Frith Solar Farm Approved, not yet built · 50 MW
Feb 2023 1.2 km away Battery storage Bramley Frith Solar Farm Approved, not yet built
Feb 2023 1.2 km away Battery storage Withy Place, Bramley Road - Battery Energy Storage Approved, not yet built · 50 MW
Jul 2025 1.8 km away Battery storage Ash Lane, Little London - Battery Storage Facility Approved, not yet built
Apr 2025 1.9 km away Battery storage Ash Lane, Little London - Battery Storage Approved, not yet built · 57 MW
Feb 2023 2.2 km away Battery storage Brickledons Farm, Clappers Farm Road - Battery Energy Storage Facility Approved, not yet built
Mar 2025 2.4 km away Solar farm Lime Tree Way, Crockford Lane - Solar Panels Approved, not yet built
Dec 2025 3.5 km away Solar farm Pinewood, Crockford Lane - Solar Panels Approved, not yet built · 200 kW
Feb 2024 4.3 km away Solar farm Manor Farm, Sherborne - Solar Farm Planning application in · 28 MW
Jul 2025 6.1 km away Rooftop solar Sainsburys, Mulfords Hill - Solar Panels Approved, not yet built · 410 kW
Oct 2025 6.4 km away Solar farm Road and street works within 1 km 4 permitted works running now or planned, 3 of them major.
Major Minchens Lane, Bramley Works for road purposes · HAMPSHIRE COUNTY COUNCIL · Multi-way signals
Mar 2026 to Oct 2026 550 m away Major The Street, Bramley Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Multi-way signals
Oct 2026 to Nov 2026 800 m away Major The Street, Bramley Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Nov 2026 to Nov 2026 800 m away Minor The Street, Bramley Utility asset works · BT · Some carriageway incursion
Oct 2026 to Oct 2026 750 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2020 20.0 km away Decided decided Sept 2016 27.5 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: Minchens Lane Battery Storage Facility (battery storage, 600 m); Berry Court Solar Farm - energy storage (battery storage, 3.6 km); Berry Court Farm (solar farm, 3.7 km); Hill End Farm (solar farm, 4.2 km); Chineham ERF (energy from waste, 4.5 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.