Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Transport
Reading Green Park stationNew station in south Reading, opened May 2023
May 2023 12.0 km away
The longer view
Like-for-like prices in Bramley, Sherfield & the Sherbornes: +17% over five years (2020 → 2025).
Council tax list: 120 homes added in the neighbourhood since April 2024.
Population (GP registrations): +2.1% in two years.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Basing RoadPlanning application in · 20 MW
Jul 2021 6.6 km away
Solar farm
Kiln Fields Solar FarmBeing built · 18 MW
Jul 2023 6.7 km away
Running nearest: Minchens Lane Battery Storage Facility (battery storage, 700 m); Berry Court Solar Farm - energy storage (battery storage, 3.6 km); Berry Court Farm (solar farm, 3.8 km); Hill End Farm (solar farm, 4.1 km); Chineham ERF (energy from waste, 4.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.