Country England and Wales › Region South East › Council Basingstoke and Deane › Neighbourhood Tadley West › Postcode RG26 4JL What's changing near RG26 4JL Within 2 km, around Tadley West in Basingstoke and Deane. Building, planning, schools, transport, prices and crime.
5 new homes completed within 2 km, last 2 years
47 homes given permission on brownfield sites since 2021
+4.2% like-for-like prices in Tadley West, 2024 → 2025 (council +3.4%)
-19% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first Planning permission Jun 2021 750 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
17 homes extended 2021–2025, typically adding 25 m²
25 since energy certificates began (2008)
1 in RG26 4JL itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
5 hours of spills in 2025 between them (typical neighbourhood: about 36)
1 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 24 planned, approved or being built and 8 running (117 MW between them). Those within 5 km are on the map above.
Rooftop solar Sainsburys, Mulfords Hill - Solar Panels Approved, not yet built · 410 kW
Oct 2025 300 m away Battery storage Ash Lane, Little London - Battery Storage Approved, not yet built · 57 MW
Feb 2023 4.4 km away Solar farm Exolum, Silver Lane - Solar PV Array Approved, not yet built · 2 MW
Jun 2026 4.6 km away Battery storage Ash Lane, Little London - Battery Storage Facility Approved, not yet built
Apr 2025 4.7 km away Battery storage Withy Place, Bramley Road - Battery Energy Storage Approved, not yet built · 50 MW
Jul 2025 5.3 km away Rooftop solar Padworth Iwmf, Padworth Lane - Solar Panels Approved, not yet built · 900 kW
May 2026 5.4 km away Solar farm Bramley Frith Solar Farm Approved, not yet built · 50 MW
Feb 2023 5.6 km away Battery storage Bramley Frith Solar Farm Approved, not yet built
Feb 2023 5.6 km away Battery storage Brickledons Farm, Clappers Farm Road - Battery Energy Storage Facility Approved, not yet built
Mar 2025 6.1 km away Solar farm Manor Farm, Sherborne - Solar Farm Planning application in · 28 MW
Jul 2025 6.4 km away Solar farm Road and street works within 1 km 15 permitted works running now or planned.
Standard Newchurch Road, Tadley Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026 300 m away Minor Reynards Close Footpaths, Tadley Utility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Nov 2026 250 m away Minor Mulfords Hill, Tadley Highway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Give and take
Oct 2026 to Oct 2026 500 m away Minor The Warren, Tadley Utility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026 600 m away Minor Kestrels Mead, Tadley Utility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026 650 m away Minor Barlows Road, Tadley Utility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Nov 2026 650 m away Minor Bishopswood Road, Tadley Utility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Nov 2026 700 m away Minor Franklin Avenue, Tadley Utility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026 700 m away Minor Stephens Road Footpaths, Tadley Utility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Nov 2026 700 m away Minor Stephens Road Footpaths, Tadley Utility asset works · THAMES WATER · Some carriageway incursion
Major infrastructure projects within 30 km Decided decided Oct 2020 25.4 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: Berry Court Farm (solar farm, 3.8 km); Berry Court Solar Farm - energy storage (battery storage, 4.0 km); Gravel Works, Wasing Estate (solar farm, 4.3 km); Hill End Farm (solar farm, 5.3 km); Minchens Lane Battery Storage Facility (battery storage, 6.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.