What's changing near RG26 4ET
Within 2 km, around Tadley West in Basingstoke and Deane. Building, planning, schools, transport, prices and crime.
5new homes completed within 2 km, last 2 years
47homes given permission on brownfield sites since 2021
+4.2%like-for-like prices in Tadley West, 2024 → 2025 (council +3.4%)
-19%recorded crime, last 12 months vs the 12 before
On the map
New homesPlanning grantedExtended homeStorm overflowEnergy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first
- Planning permissionJun 2021
1.0 km away
New-home postcodes with fewer than 5 homes are counted above but not listed. 4 postcodes nearby had new homes completed in the last two years.
12homes extended 2021–2025, typically adding 27 m²
20since energy certificates began (2008)
1in RG26 4ET itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km
1storm overflows within 2 km
5hours of spills in 2025 between them (typical neighbourhood: about 36)
1spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km
24 planned, approved or being built and 8 running (117 MW between them). Those within 5 km are on the map above.
- Rooftop solar
Sainsburys, Mulfords Hill - Solar PanelsApproved, not yet built · 410 kW
Oct 2025
450 m away - Solar farm
Exolum, Silver Lane - Solar PV ArrayApproved, not yet built · 2 MW
Jun 2026
4.5 km away - Battery storage
Ash Lane, Little London - Battery StorageApproved, not yet built · 57 MW
Feb 2023
4.7 km away - Battery storage
Ash Lane, Little London - Battery Storage FacilityApproved, not yet built
Apr 2025
5.0 km away - Rooftop solar
Padworth Iwmf, Padworth Lane - Solar PanelsApproved, not yet built · 900 kW
May 2026
5.2 km away - Battery storage
Withy Place, Bramley Road - Battery Energy StorageApproved, not yet built · 50 MW
Jul 2025
5.5 km away - Solar farm
Bramley Frith Solar FarmApproved, not yet built · 50 MW
Feb 2023
5.8 km away - Battery storage
Bramley Frith Solar FarmApproved, not yet built
Feb 2023
5.8 km away - Battery storage
Brickledons Farm, Clappers Farm Road - Battery Energy Storage FacilityApproved, not yet built
Mar 2025
6.3 km away - Solar farm
Bath Road, Grange Lane - Solar Photovoltaic ArrayApproved, not yet built · 12 MW
Mar 2025
6.5 km away - Battery storage
Road and street works within 1 km
13 permitted works running now or planned.
- Standard
Newchurch Road, TadleyHighway improvement works · HAMPSHIRE COUNTY COUNCIL · Two-way signals
Oct 2026 to Oct 2026
200 m away - Minor
Kestrels Mead, TadleyUtility repair and maintenance works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
400 m away - Minor
Franklin Avenue, TadleyUtility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026
450 m away - Minor
Priors Road, TadleyUtility asset works · THAMES WATER · No carriageway incursion
Nov 2026 to Nov 2026
450 m away - Minor
Reynards Close Footpaths, TadleyUtility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Nov 2026
550 m away - Minor
Bishopswood Road, TadleyUtility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Nov 2026
550 m away - Minor
Whitedown Road Footpath, TadleyUtility asset works · THAMES WATER · Some carriageway incursion
Oct 2026 to Oct 2026
700 m away - Minor
Mulfords Hill, TadleyHighway repair and maintenance works · HAMPSHIRE COUNTY COUNCIL · Give and take
Oct 2026 to Oct 2026
800 m away - Minor
The Warren, TadleyUtility asset works · THAMES WATER · No carriageway incursion
Oct 2026 to Oct 2026
850 m away - Minor
Barlows Road, TadleyUtility asset works · THAMES WATER · Some carriageway incursion
Major infrastructure projects within 30 km
- Decideddecided Oct 2020
25.7 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Running nearest: Gravel Works, Wasing Estate (solar farm, 4.0 km); Berry Court Farm (solar farm, 4.0 km); Berry Court Solar Farm - energy storage (battery storage, 4.3 km); Hill End Farm (solar farm, 5.6 km); Minchens Lane Battery Storage Facility (battery storage, 6.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.