Country England and Wales › Region South East › Council Basingstoke and Deane › Neighbourhood Popley › Postcode RG24 9UP What's changing near RG24 9UP Within 2 km, around Popley in Basingstoke and Deane. Building, planning, schools, transport, prices and crime.
48 new homes completed within 2 km, last 2 years
5 homes given permission on brownfield sites since 2021
+2.8% like-for-like prices in Popley, 2024 → 2025 (council +3.4%)
+8% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 6 new homes completed houses · Oct 2026
planned Oct 2026 1.2 km away New homes 13 new homes completed 9 flats, 4 houses · Aug 2026 – Oct 2026
planned Oct 2026 1.4 km away New homes 9 new homes completed houses · Jul 2026 – Oct 2026
planned Oct 2026 1.2 km away New homes 5 new homes completed houses · Aug 2026
Aug 2026 200 m away New homes 9 new homes completed houses · Nov 2024 – May 2025
May 2025 1.3 km away Planning permission Mar 2022 1.3 km away New school Apr 2021 1.7 km away New school Apr 2021 1.3 km away New-home postcodes with fewer than 5 homes are counted above but not listed. 8 postcodes nearby had new homes completed in the last two years.
14 homes extended 2021–2025, typically adding 39 m²
26 since energy certificates began (2008)
0 in RG24 9UP itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 22 planned, approved or being built and 9 running (125 MW between them). Those within 5 km are on the map above.
Rooftop solar Inchcape Estates, Edison Road - Solar Panels Approved, not yet built · 150 kW
Jul 2023 1.2 km away Rooftop solar Gemini Centre, Hamilton Close - Solar Panels Approved, not yet built · 340 kW
May 2023 1.5 km away Solar farm Pinewood, Crockford Lane - Solar Panels Approved, not yet built · 200 kW
Feb 2024 2.1 km away Rooftop solar Worting Road - Solar Panels Approved, not yet built · 180 kW
Nov 2021 2.3 km away Rooftop solar Worting Road - Solar Array Approved, not yet built · 470 kW
Feb 2022 2.6 km away Solar farm Manor Farm, Sherborne - Solar Farm Planning application in · 28 MW
Jul 2025 2.6 km away Rooftop solar Hollywood Bowl, Basingstoke Leisure Park - Solar Panel Photovoltaics Approved, not yet built · 200 kW
Jul 2022 2.7 km away Solar farm Lime Tree Way, Crockford Lane - Solar Panels Approved, not yet built
Dec 2025 2.9 km away Rooftop solar The Costello School - Solar PV Array Approved, not yet built
Oct 2025 2.9 km away Battery storage Basing Road Planning application in · 20 MW
Jul 2021 3.1 km away Solar farm Hook Lane, Malshanger
Road and street works within 1 km 5 permitted works running now or planned, 2 of them major.
Major Abbey Road, Basingstoke Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Give and take
Jul 2026 to Nov 2026 600 m away Major Popley Way, Basingstoke Section 50 · HAMPSHIRE COUNTY COUNCIL · Multi-way signals
Sept 2026 to Oct 2026 750 m away Minor Melrose Walk, Basingstoke Utility asset works · VIRGIN MEDIA · Give and take
Oct 2026 to Oct 2026 600 m away Minor Barrington Drive, Basingstoke Utility repair and maintenance works · SOUTH EAST WATER · Some carriageway incursion
Oct 2026 to Oct 2026 900 m away Minor Ringway North - Eastbound Carriageway, Basingstoke Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Lane closure
Nov 2026 to Nov 2026 950 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2020 17.3 km away Decided decided May 2024 27.4 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: Hill End Farm (solar farm, 3.1 km); Chineham ERF (energy from waste, 4.2 km); Basingstoke Sewage Treatment Works (anaerobic digestion, 4.4 km); Berry Court Solar Farm - energy storage (battery storage, 4.5 km); Berry Court Farm (solar farm, 4.8 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.