M3 Junction 9 ImprovementHighways · Adjacent to Winnal industrial estate, Winchester, north of Alresford Road B3404
decided May 2024 27.5 km away
Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km
Transport
Reading Green Park stationNew station in south Reading, opened May 2023
May 2023 17.3 km away
The longer view
Like-for-like prices in Popley: +17% over five years (2020 → 2025).
Council tax list: 0 homes added in the neighbourhood since April 2024.
Population (GP registrations): -0.1% in two years.
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Approved, not yet built · 30 MW
Feb 2026 5.9 km away
Battery storage
Ash Lane, Little London - Battery StorageApproved, not yet built · 57 MW
Feb 2023 6.0 km away
Running nearest: Hill End Farm (solar farm, 3.2 km); Chineham ERF (energy from waste, 3.9 km); Basingstoke Sewage Treatment Works (anaerobic digestion, 4.1 km); Berry Court Solar Farm - energy storage (battery storage, 4.7 km); Berry Court Farm (solar farm, 4.9 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.