Country England and Wales › Region South East › Council Basingstoke and Deane › Neighbourhood Chineham › Postcode RG24 8XQ What's changing near RG24 8XQ Within 2 km, around Chineham in Basingstoke and Deane. Building, planning, schools, transport, prices and crime.
115 new homes completed within 2 km, last 2 years
0 homes given permission on brownfield sites since 2021
+4.6% like-for-like prices in Chineham, 2024 → 2025 (council +3.4%)
+10% recorded crime, last 12 months vs the 12 before
On the map
New homes Extended home Storm overflow Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New homes 15 new homes completed houses · Dec 2025 – Oct 2026
Oct 2026 1.0 km away New homes 8 new homes completed houses · Feb 2025 – Jun 2026
Jun 2026 900 m away New homes 10 new homes completed houses · Jul 2025 – May 2026
May 2026 900 m away New homes 34 new homes completed 5 flats, 29 houses · Mar 2025 – Apr 2026
Apr 2026 1.1 km away New homes 20 new homes completed houses · Jun 2025 – Nov 2025
Nov 2025 850 m away New homes 8 new homes completed houses · May 2025 – Oct 2025
Oct 2025 900 m away New homes 11 new homes completed houses · Mar 2025 – Aug 2025
Aug 2025 850 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 11 postcodes nearby had new homes completed in the last two years.
12 homes extended 2021–2025, typically adding 27 m²
27 since energy certificates began (2008)
2 in RG24 8XQ itself
Extended certificate 2024 Extended certificate 2016 Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km 1 storm overflows within 2 km
397 hours of spills in 2025 between them (typical neighbourhood: about 36)
40 spill events counted
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 27 planned, approved or being built and 8 running (123 MW between them). Those within 5 km are on the map above.
Solar farm Lime Tree Way, Crockford Lane - Solar Panels Approved, not yet built
Dec 2025 600 m away Solar farm Pinewood, Crockford Lane - Solar Panels Approved, not yet built · 200 kW
Feb 2024 1.2 km away Battery storage Basing Road Planning application in · 20 MW
Jul 2021 3.3 km away Rooftop solar Inchcape Estates, Edison Road - Solar Panels Approved, not yet built · 150 kW
Jul 2023 4.3 km away Rooftop solar The Costello School - Solar PV Array Approved, not yet built
Oct 2025 4.3 km away Rooftop solar Gemini Centre, Hamilton Close - Solar Panels Approved, not yet built · 340 kW
May 2023 4.5 km away Solar farm Bramley Frith Solar Farm Approved, not yet built · 50 MW
Feb 2023 4.7 km away Battery storage Bramley Frith Solar Farm Approved, not yet built
Feb 2023 4.7 km away Battery storage Ash Lane, Little London - Battery Storage Facility Approved, not yet built
Apr 2025 5.1 km away Battery storage Ash Lane, Little London - Battery Storage Approved, not yet built · 57 MW
Feb 2023 5.1 km away Rooftop solar Worting Road - Solar Array
Road and street works within 1 km 2 permitted works running now or planned.
Minor Reading Road, Sherfield-On-Loddon Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Lane closure
Oct 2026 to Oct 2026 750 m away Minor Hanmore Road, Chineham Utility repair and maintenance works · SOUTH EAST WATER · No carriageway incursion
Oct 2026 to Nov 2026 850 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2020 16.6 km away Decided decided Sept 2016 29.7 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: Chineham ERF (energy from waste, 1.3 km); Basingstoke Sewage Treatment Works (anaerobic digestion, 1.5 km); Minchens Lane Battery Storage Facility (battery storage, 3.9 km); Hill End Farm (solar farm, 4.3 km); Berry Court Solar Farm - energy storage (battery storage, 5.0 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.