Country England and Wales › Region South East › Council Basingstoke and Deane › Neighbourhood Kempshott › Postcode RG22 6LA What's changing near RG22 6LA Within 2 km, around Kempshott in Basingstoke and Deane. Building, planning, schools, transport, prices and crime.
2 new homes completed within 2 km, last 2 years
5 homes given permission on brownfield sites since 2021
+5.0% like-for-like prices in Kempshott, 2024 → 2025 (council +3.4%)
-6% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first New school Sept 2024 1.4 km away New school Jun 2024 450 m away Planning permission Feb 2022 750 m away New-home postcodes with fewer than 5 homes are counted above but not listed. 2 postcodes nearby had new homes completed in the last two years.
20 homes extended 2021–2025, typically adding 31 m²
28 since energy certificates began (2008)
1 in RG22 6LA itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 15 planned, approved or being built and 10 running (137 MW between them). Those within 5 km are on the map above.
Rooftop solar Hollywood Bowl, Basingstoke Leisure Park - Solar Panel Photovoltaics Approved, not yet built · 200 kW
Jul 2022 1.5 km away Rooftop solar Worting Road - Solar Array Approved, not yet built · 470 kW
Feb 2022 1.7 km away Rooftop solar Worting Road - Solar Panels Approved, not yet built · 180 kW
Nov 2021 1.8 km away Rooftop solar Sainsburys, Wallop Drive- Solar Panels Approved, not yet built · 550 kW
Nov 2023 2.2 km away Rooftop solar Gemini Centre, Hamilton Close - Solar Panels Approved, not yet built · 340 kW
May 2023 2.7 km away Rooftop solar Inchcape Estates, Edison Road - Solar Panels Approved, not yet built · 150 kW
Jul 2023 2.9 km away Rooftop solar The Costello School - Solar PV Array Approved, not yet built
Oct 2025 3.1 km away Battery storage Basing Road Planning application in · 20 MW
Jul 2021 4.5 km away Solar farm Hook Lane, Malshanger Approved, not yet built · 30 MW
Feb 2026 4.9 km away Solar farm Manor Farm, Sherborne - Solar Farm Planning application in · 28 MW
Jul 2025 5.2 km away Anaerobic digestion Bushywarren Lane, Ellisfield - Anaerobic Digestor Plant
Road and street works within 1 km 6 permitted works running now or planned, 3 of them major.
Major Winchester Road, Basingstoke Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Lane closure
Sept 2026 to Dec 2026 1000 m away Major, planned Cobbett Green, Basingstoke Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Sept 2026 to Dec 2026 1000 m away Major Cobbett Green, Basingstoke Highway improvement works · HAMPSHIRE COUNTY COUNCIL · Road closure
Sept 2026 to Dec 2026 1000 m away Standard Buckland Avenue, Basingstoke Utility repair and maintenance works · SOUTH EAST WATER · No carriageway incursion
Nov 2026 to Nov 2026 300 m away Minor Winchester Road, Basingstoke Utility repair and maintenance works · VODAFONE GROUP · Two-way signals
Mar 2027 to Mar 2027 350 m away Minor Pitman Close, Basingstoke Utility repair and maintenance works · SOUTH EAST WATER · Some carriageway incursion
Oct 2026 to Oct 2026 500 m away DfT Street Manager permits (OGL), England. Dates are the planned ones; works often finish early or overrun.
Major infrastructure projects within 30 km Decided decided Oct 2020 16.0 km away Decided decided May 2024 23.3 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km None on our list yet. We're starting with recently opened and under-construction rail schemes.
Running nearest: Carousel Dairy AD Plant (Farm AD) (anaerobic digestion, 3.7 km); Green Waste Composting Facility (Waste AD) (anaerobic digestion, 5.5 km); Frying Down Copse Solar Farm (solar farm, 5.5 km); Hill End Farm (solar farm, 6.7 km); Chineham ERF (energy from waste, 7.3 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.