Country England and Wales › Region South East › Council Basingstoke and Deane › Neighbourhood Kings Furlong › Postcode RG21 8UL What's changing near RG21 8UL Within 2 km, around Kings Furlong in Basingstoke and Deane. Building, planning, schools, transport, prices and crime.
13 new homes completed within 2 km, last 2 years
84 homes given permission on brownfield sites since 2021
+1.5% like-for-like prices in Kings Furlong, 2024 → 2025 (council +3.4%)
-6% recorded crime, last 12 months vs the 12 before
On the map
New homes Planning granted School opened Extended home Energy projectBlack pin: the postcode. Tap a dot for details.
Nearby, most recent first 13 homes extended 2021–2025, typically adding 24 m²
30 since energy certificates began (2008)
1 in RG21 8UL itself
Spotted when a home's energy certificate shows at least 15 m² (and 15%) more floor area than an earlier one. Only homes with two certificates show up, so the real number is higher. A busy street suggests extensions get permission here; check the council's planning register for the details.
Storm overflows within 2 km No monitored sewer storm overflows within 2 km (England only).
Environment Agency event duration monitoring, 2025 annual return (OGL; © Environment Agency copyright and/or database right 2026). Overflows release diluted sewage into rivers and the sea when sewers are overwhelmed, mostly after heavy rain.
Solar, wind and battery projects within 10 km 20 planned, approved or being built and 10 running (137 MW between them). Those within 5 km are on the map above.
Rooftop solar Worting Road - Solar Array Approved, not yet built · 470 kW
Feb 2022 750 m away Rooftop solar The Costello School - Solar PV Array Approved, not yet built
Oct 2025 1.1 km away Rooftop solar Worting Road - Solar Panels Approved, not yet built · 180 kW
Nov 2021 1.3 km away Rooftop solar Hollywood Bowl, Basingstoke Leisure Park - Solar Panel Photovoltaics Approved, not yet built · 200 kW
Jul 2022 1.7 km away Rooftop solar Gemini Centre, Hamilton Close - Solar Panels Approved, not yet built · 340 kW
May 2023 1.7 km away Rooftop solar Inchcape Estates, Edison Road - Solar Panels Approved, not yet built · 150 kW
Jul 2023 1.9 km away Battery storage Basing Road Planning application in · 20 MW
Jul 2021 2.4 km away Solar farm Pinewood, Crockford Lane - Solar Panels Approved, not yet built · 200 kW
Feb 2024 3.9 km away Rooftop solar Sainsburys, Wallop Drive- Solar Panels Approved, not yet built · 550 kW
Nov 2023 4.2 km away Solar farm Manor Farm, Sherborne - Solar Farm Planning application in · 28 MW
Jul 2025 4.8 km away Solar farm
Road and street works within 1 km 33 permitted works running now or planned, 23 of them major.
Major Bramblys Drive, Basingstoke Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Aug 2026 to Oct 2026 150 m away Major, planned Penrith Road, Basingstoke Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Sept 2026 to Oct 2026 150 m away Major Penrith Road, Basingstoke Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Some carriageway incursion
Sept 2026 to Oct 2026 150 m away Major Fabian Close, Basingstoke Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Aug 2026 to Oct 2026 250 m away Major, planned Fletcher Close Footpaths, Basingstoke Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Oct 2026 350 m away Major Fletcher Close Footpaths, Basingstoke Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · Give and take
Oct 2026 to Nov 2026 350 m away Major, planned Packenham Road Footpaths, Basingstoke Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Oct 2026 to Oct 2026 350 m away Major Packenham Road Footpaths, Basingstoke Utility repair and maintenance works · SOUTHERN GAS NETWORKS PLC · No carriageway incursion
Oct 2026 to Nov 2026 350 m away Major, planned Major infrastructure projects within 30 km Decided decided Oct 2020 15.2 km away Decided decided May 2024 25.1 km away Planning Inspectorate list of nationally significant infrastructure projects (roads, railways, energy, water, waste), October 2026 (OGL). Each is placed at one point, usually the middle of the site; long schemes run well beyond it.
Transport schemes within 20 km Running nearest: Chineham ERF (energy from waste, 5.2 km); Green Waste Composting Facility (Waste AD) (anaerobic digestion, 5.3 km); Carousel Dairy AD Plant (Farm AD) (anaerobic digestion, 5.3 km); Basingstoke Sewage Treatment Works (anaerobic digestion, 5.4 km); Frying Down Copse Solar Farm (solar farm, 5.4 km).
DESNZ Renewable Energy Planning Database, April to June 2026 (OGL). Projects of 150 kW and over; refused, withdrawn and abandoned ones are left out.